Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 14, 2025 at 8:00 PM
Updated August 15, 2025
Site work and paving for a mixed-use development in Ottawa, Ontario. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
TSTS-EW-3005 - Enabling Road Works Package. The scope of work associated with this RFQ includes but is not limited to the supply of all materials, labour, and installation associated with Stage 1 Enabling Works - Road work and includes asphalt reconstruction and concrete curb reconstruction, installation of topsoil and sod, pathway reconstruction, and concrete sidewalk reconstruction. A high-level overview of the scope of work is as follows, subject to change: Asphalt Reconstruction - Full Depth: Subcontractor to supply and install full depth reconstruction of asphalt of specified areas of Legget Street, Hutcheon Avenue, and Howlett Street. Full depth reconstruction consists of 12.5mm Asphalt surface course on 19.0 Asphalt base course on GRANULAR A on GRANULAR B. Subcontractor to provide and compact new granular base layers. Subcontractor to supply, place, and compact asphalt lifts. Subcontractor to supply and install pavement markings as specified by drawings. Asphalt Reconstruction - Partial Depth: Subcontractor to supply and install Partial depth reconstruction of asphalt of specified areas on Legget Street, Hutcheon Avenue, and Howlett Street. Subcontractor to remove existing surface course to specified depth and repave. Subcontractor to match joints flush. Concrete Curbs: Subcontractor to supply and install new concrete curbs along specified areas of roadway. Subcontractor to provide and install formwork for concrete curbs as per drawing profiles. Concrete curbs follow OPSD 600.110 standards. Other items: Subcontractor to supply and install sod over 100mm topsoil along specified areas of roadway. Subcontractor to water and maintain sod until accepted by CM. Subcontractor to supply and install pathway reconstruction where specified on drawings. This consists of 50mm HL3F MIX W/ PGAC 58-34 ASPHALT 150mm GRANULAR A. Subcontractor to supply and install concrete sidewalk reconstruction where specified on drawings. This consists of 150mm concrete sidewalk, 150mm GRANULAR A. Subcontractor to supply and install paving stone pathway. Question Acceptance Deadline: 2025/08/06 02:00:00 AM EDT Official bid documents must be obtained from www.merx.com * The project value listed reflects the package estimate.
Post-Bid
Roads / Highways
$400,000.00
Public - Federal
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2025
September 15, 2025
1200 Montréal Rd, Ottawa, ON
Related To This Project
Ottawa, ON
Bid Date: Oct 29 2025
Ottawa, ON
Bid Date: Aug 05 2025
Ottawa, ON
Bid Date: Aug 28 2025
Ottawa, ON
Bid Date: Aug 21 2025
Ottawa, ON
Bid Date: Aug 27 2025
Ottawa, ON
Bid Date: Aug 20 2025
Ottawa, ON
Bid Date: Sep 03 2025
Ottawa, ON
Bid Date: Aug 27 2025
Ottawa, ON
Bid Date: Sep 12 2025
Ottawa, ON
Bid Date: Aug 19 2025
Ottawa, ON
Bid Date: Sep 04 2025
Ottawa, ON
--
Ottawa, ON
--
Ottawa, ON
Bid Date: Aug 19 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
