BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 29, 2025 at 8:00 PM

Updated August 30, 2025

Site work and paving for a sidewalk / parking lot in Clinton Township, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000394203 The approximate primary quantities involved in this work include, but are not limited to: Ex Arborvitae, Rem & Replace - 27 Ea Dr Structure, Rem & Replace w/ Conc. Collar - 1 Ea Pavt, Rem - 1,530 Syd Aggregate Base, 4 inch - 14 Syd Aggregate Base, 6 inch - 130 Syd Aggregate Base, 12 inch - 1,360 Syd Geogrid - 1,360 Syd SciClonX Pretreatment Structure - 1 Ea Underdrain, Subgrade, 6 inch - 230 Ft HMA, 4EML - 230 Ton HMA, 5EML - 155 Ton Conc Pavt with Integral Curb, Nonreinf, 8 inch - 130 Syd Curb and Gutter, Conc, Det F2 - 578 Ft Driveway Opening, Conc, Det M - 80 Ft Curb Ramp Opening, Conc - 20 Ft Curb Ramp, Conc, 4 inch - 40 Sft Curb Ramp, Conc, 6 inch - 81 Sft Ex Arborvitae, Rem & Replace - 27 Ea This primary work shall be included together with miscellaneous site improvements and all other incidental work outlined on the Bid Form, which includes site clearing/removals, tree removals and restoration. Question Deadline 08/15/2025 at 5:00 PM ET Questions are submitted online No The project shall commence immediately following a notice to proceed per these contract documents. The Work will be substantially completed on or before November 30, 2025, and the final completion on or before May 15, 2026, and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before June 1,2026. Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % A certified check, bank draft, or satisfactory bid bond, executed by the bidder and a surety company, payable to Clinton Township, in an amount at least equal to five percent (5%) of the bid amount, shall be submitted with each bid. The accepted bidder shall be required to furnish a satisfactory Performance Bond, and Labor and Material Bond in the amount of 100% of the Contract Price, and Maintenance and Guarantee Bond of 100% for two years of the Final Contract Price. The cost of the bonds will be paid by the accepted bidder. No Bid may be withdrawn for a period of sixty (60) calendar days after receipt of bids. Please contact Mr. Scott J. Chabot, P.E. from Anderson, Eckstein & Westrick, Inc. at (586) 726-1234 for any specific questions regarding this advertisement to bid. Bids shall remain firm for a period of sixty (60) days. The Charter Township of Clinton reserves the right to accept or reject any or all bids, to award the agreement to other than the low proposal, to negotiate the terms and conditions of all and any part of the bids, to waive irregularities and/or formalities, and in general to make award in the manner as determined to be in the Township's best interest and its sole discretion.

Bid Results

Sidewalks / Parking Lot

$267,986.00

Public - City

Paving, Site Work

17

15

6

5

Subscribe For Documents

78 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
289
Active Projects
140
Bidding Soon
2,259
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

September 19, 2025

Project location map

To Be Determined, Clinton Township, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.