Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 3, 2026 at 8:00 PM
Updated May 21, 2026
Site work and new construction of a municipal facility in Morrisville, North Carolina. Working plans call for site work for a municipal facility; and for the construction of a 4,800-square-foot, six-space municipal facility.
https://www.wake.gov/departments-government/facilities-design-construction/facilities-design-construction-projects/planned-projects Wake County has established convenience centers throughout the County to provide recycling and waste disposal services to residents in unincorporated areas. Convenience Center #3 is located along Aviation Parkway just outside the Town of Morrisville. This site is adjacent to the town’s existing Public Works facility at 414 Aviation Parkway. Due to the proposed widening of Aviation Parkway, the Town of Morrisville and Wake County have established an agreement to jointly redevelop this town-owned site for their respective facilities ------------------------------------------------------------------------------------------------------------------------------------------------------------ https://www.wake.gov/departments-government/facilities-design-construction/facilities-design-construction-projects/planned-projects/west-wake-solid-waste-facility Wake County has established convenience centers throughout the County to provide recycling and waste disposal services to residents in unincorporated areas. Convenience Center #3 is located along Aviation Parkway just outside the Town of Morrisville. This site is adjacent to the town’s existing Public Works facility at 414 Aviation Parkway. Due to the proposed widening of Aviation Parkway, the Town of Morrisville and Wake County have established an agreement to jointly redevelop this town-owned site for their respective facilities. During the spring of 2025, the Town of Morrisville bought an existing facility along International Drive to renovate and relocate their Public Works Department. Wake County and the Town of Morrisville are working together for Wake County to proceed with the design and construction of the new West Wake Solid Waste Facility at the 414 Aviation Parkway location. The project will be redesigned and permitted in FY2026 and construction will start in FY2027. ----------------------------------------------------------------------------------------------- As of February 9, 2026, the project is planned to recieve permitting and be designed in 2026. A construction manager and engineer have been selected. Construction is expected to begin in 2027, with occupancy in 2028.
Pre-Construction/Negotiated
Municipal
$33,500,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 31, 2026
414 Aviation Pkwy, Morrisville, NC
Related To This Project
Morrisville, NC
--
Morrisville, NC
Bid Date: Sep 16 2025
Morrisville, NC
Bid Date: Aug 26 2025
Morrisville, NC
Bid Date: Sep 02 2025
Morrisville, NC
Bid Date: Feb 10 2026
Morrisville, NC
Bid Date: Sep 11 2025
Morrisville, NC
Bid Date: Sep 09 2025
Morrisville, NC
Bid Date: Oct 28 2025
Morrisville, NC
Bid Date: Aug 06 2025
Morrisville, NC
Bid Date: Jul 22 2025
Morrisville, NC
Bid Date: Aug 20 2025
Morrisville, NC
Bid Date: Oct 02 2025
Morrisville, NC
Bid Date: Jul 14 2025
Morrisville, NC
Bid Date: Jul 18 2025
Morrisville, NC
Bid Date: Jun 26 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
