BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 21, 2025

Site work and paving for a road / highway in Kirkwood, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City of Kirkwood is requesting sealed bids for 2025 Concrete Pavement Joint and Crack Sealing for the Citys Engineering Department , in accordance with the specifications contained herein. Question Cuttoff Date & Time 8/13/2025 12:00:00 AM (ET) QA 8/11/25: You have the choice to use backer rod or install full-depth. With the anticipated start date and calendar days specified, we are anticipating work to be completed before the end of December. This project is considered Maintenance so prevailing wage is not applicable.

Post-Bid

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
98
Bidding Soon
1,250
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

September 19, 2025

Project location map

Multiple Locations, Kirkwood, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.