Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 14, 2025 at 8:00 PM
Updated August 27, 2025
Site work and new construction of a mixed-use development in Sedalia, Missouri. Completed plans call for site work for a recreation facility; for the construction of a fire / police facility; and fire / police facility.
Sedalia Fire Station and Bowling Alley Locations- Fire Station - 600 E 5 th Street, Sedalia MO 65301 Fire Training - 540 E 5 th Street, Sedalia MO 65301 Bowling Alley - 643 E Boadway, Sedalia MO 65301 Job Description: Fire Station, Fire Training, Bowling Alley Approximate Construction Start: September 2025 Approximate Construction Finish: September 2026 Refer to the Instructions to Bidders section in the Construction Managers Manual for bidding instructions and obligations. Nabholz Construction Corp, encourages all small, minority-owned, women- owned, or disadvantaged business enterprises to submit bids for this project. RFI/Bid Question Deadline: 2:00 PM on 8/15/2025 All bid responses or inquiries should be sent to: Nabholz Construction, Jarrett Sims, jarrett.sims@nabholz.com Subcontractor or Supplier agrees that the Base Bid amount entered above includes the following projectrelated activities and Scope of Work in accordance with the requirements of the specifications, drawings, and CM Manual. Unless noted otherwise subcontractor will furnish all equipment, materials, labor, supplies, tools, scaffolding, hoisting, transportation, unloading, and handling necessary for the proper installation and completion of this work. Section A: Trade- Specific Requirements 1. Provide final construction cleaning service. 2. Time is of the essence. Furnish adequate manpower to clean areas of the building so as not to adversely impact move in by the owner. 3. Cleaning compounds must be compatible with surfaces. Section B: Project Specific Requirements: 1. Wipe down all surfaces. 2. Clean all interior glass and mirrors. 3. Clean all exterior window glass. 4. Vacuum sweep carpet. 5. Wet mop vinyl floors. 6. Wet mop porcelain and ceramic tile floors. 7. Dust clean all countertops and millwork drawers and cabinets. 8. Clean light fixtures, sinks and tub plumbing fixtures and trim. 1. Prepare and construct all building concrete assemblies, including but not limited to wall and column foundations, footings and mats, grade beams, slabs on grade, ramps, trenches, pits, equipment pads, structural slabs, and slabs on deck as indicated in the construction documents. 2. Furnish and install all expansion and construction joints including isolation joints, keyways, dowels and saw cutting as required. 3. Include all associated excavation, backfill, and compaction (both interior and exterior perimeters). Move spoils off-site. 4. Backfill compaction must meet requirements of specifications. 5. Include formwork, bedding and leveling materials, reinforcing steel and mesh, tie wire, bolsters and supports, void forms, board insulation, concrete ready-mix, methods of conveyance (i.e. pumps, buggies), admixtures, curing and hardening compounds, concrete accessories, joints and weeps, sleeves, drain boxes and covers, filter fabrics and moisture membranes, finishing, and rubbing. 6. Install all embedded items (including bollards, sleeves, anchor bolts) furnished by others. 7. Furnish, install, and compact gravel base at concrete flatwork where required. 8. Provide and install truncated warning devices if required. 9. Provide termite treatment in accordance with specifications. 10. Grout all base plates as required. 11. Include bituminous paint of steel 12. Install and maintain a designated concrete wash down area. 13. Provide all cold weather and/or hot weather protection as required to maintain Project Schedule in accordance with ACI standards. 14. Provide generator power if electric is not readily available. 15. Unless more stringent requirements are specified, maintain maximum flatness tolerance of 1/8 inch in 10 feet for all floor slabs. 16. Final surfaces shall be as specified and free from cracks, voids, and spalls. Positive drainage of water shall be provided on traffic surfaces, without ponds or water stands. Should final surfaces contain any of the above mentioned, items shall be repaired at no additional cost to the Owner. 17. Replace grades to original condition in affected areas adjacent to work performed. 18. Concrete curing shall be in accordance with the construction documents and ACI. 19. Include temporary shoring of metal deck as required to support concrete materials. 20. Include foundation layout with base line established by professional surveyor. Check and maintain survey control points and layout anchor bolts. 21. Coordinate with plumbing and electrical trades regarding work that is under or in concrete. 22. Coordinate city inspections. 23. Dewatering of the excavations associated with this scope of work as required. Preserve structural integrity and workability Section B: Project Specific Requirements: 1. Rigid Insulation concrete Rigid Insulation/Geofoam Detail 13 & 14 2. Coordinate with framing contractor for layout of specialty connections as shown on 2/S-403 furnished by framing contractor. 3. Install hold down connections furnished by others. 4. ACI certified Flatwork Technician per specifications 5. Include Waterproofing Admixture - Concure, Barrier One, Vapor Lock. 6. Flag pole foundation per sheet L101. 7. Form footings as noted/required per notes on plans.
Post-Bid
Fire / Police
$100,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 26, 2025
September 1, 2025
Multiple Locations, Sedalia, MO
Related To This Project
Sedalia, MO
Bid Date: Sep 02 2025
Sedalia, MO
Bid Date: Sep 05 2025
Sedalia, MO
Bid Date: Sep 24 2025
Sedalia, MO
Bid Date: Sep 11 2025
Sedalia, MO
Bid Date: Oct 16 2025
Sedalia, MO
Bid Date: Dec 10 2025
Sedalia, MO
Bid Date: Oct 21 2025
Sedalia, MO
Bid Date: Oct 06 2025
Sedalia, MO
Bid Date: Aug 12 2025
Sedalia, MO
Bid Date: Dec 11 2025
Sedalia, MO
Bid Date: Aug 01 2025
Sedalia, MO
Bid Date: Jul 02 2025
Sedalia, MO
Bid Date: Jun 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
