BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2025 at 8:00 PM

Updated August 1, 2025

Demolition, site work, paving and addition to a mixed-use development in Eugene, Oregon. Conceptual plans call for site work for a transportation facility; for the addition of a transportation facility; for the demolition of a transportation facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The expansion of Concourse A hold room area and construction of an Americans with Disabilities Act (ADA)-compliant emergency exit ramp will increase safety and capacity to accommodate Eugene Airport's growth. The existing Concourse A hold rooms offer 7,756 square feet of seating space and are undersized for the current fleet mix. This project will add approximately 5,400 square feet to the currently underutilized connector bridge, and will act as a central, shared seating space serving all the Concourse A gates. In addition to seating, this expansion will allow for the construction of an ADA emergency exit ramp from the airside. Currently, ADA access is through a single public area elevator. Providing a non-mechanical option for exiting the building from the airside would improve accessibility for all passengers. This project will also include ADA Gender Neutral Restroom Upgrades to all restrooms on the first and second floors, ADA Carpet replacement on both the first and second floors, Adult Changing Room upgrades, addition of a Sensory Room, and some remodeling of adjacent spaces. This project enhances safety by providing accessible pathways for individuals with disabilities, ensuring quick and efficient evacuation in case of emergencies, and reducing crowding. As of July 31, 2025, The project is include in the City's 2026-2031 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Transportation Terminals

$19,350,000.00

Public - City

Addition, Demolition, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
4
Bidding Soon
315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.