BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2025 at 8:00 PM

Updated August 22, 2025

Site work for a fire / police facility in Washington, District of Columbia. Completed plans call for site work for a fire / police facility.

The DC Department of General Services- Capital Construction Services (DGS-CCS) is the implementing agency for the District of Columbia Capital construction project for the Metropolitan Police Department (MPD) Training Academy. MPD is 24 hours, 7 days a week operation. DGS, on behalf of MPD is completing Entry Gate replacement at MPD Training Academy located. DGS is hereby soliciting services from a qualified firm (Contractor) to work closely with the DGS-CCS Project Manager (PM) to provide Construction Services to the Metropolitan Police Department (MPD) Training Academy listed in the SOW. This selected Contractor shall work not more than 40 hours per week between 7:00 a.m. and 5:00 p.m. unless otherwise directed by the DGS PM. DGS shall provide written notification to Contractor when hours outside of 7:00 a.m. to 5:00 p.m. are required and proceed with written approval from MPD and DGS PM. All testing required onsite will be scheduled in advance by DGS PM with the Contractor. A list of all workers will need to be sent prior to any work beginning. The term of the Contract shall be from the date of the CO execution through September 26, 2025 (Substantial Completion Date). Final Completion shall be no later than October 24, 2025 (Final Completion Date). Question Submission Deadline: August 8, 2025, 2:00pm If a prospective bidder has any questions relative to this solicitation, the prospective Bidder shall submit the questions in writing. The prospective Bidder shall submit questions through the DGS portal using the link. Scope Of work The scope of work requires the satisfactory completion of the Project as outlined in the specifications contained therein for the MPD Training Academy Entry Gate Replacement. The work shall be performed in accordance with this Section C - Scope of Work Statement (Attachment A). In particular, the Contractor shall coordinate the construction work with MPD. The Contractor shall comply with all the regulations and code requirements that are applicable and as specified to District building construction. It shall be the responsibility of the Contractor to review all existing documents and conduct site visits to ascertain existing conditions.

Bid Results

Fire / Police

$38,500.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
450
Active Projects
188
Bidding Soon
2,938
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2025

September 18, 2025

Project location map

4665 Blue Plains Dr SW, Washington, DC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.