Renovation of a mixed-use development in Saint Paul, Minnesota. Completed plans call for the renovation of a 12,500-square-foot educational facility.

Question deadline is 01/23/2026 at 03:00 PM PROJECT DESCRIPTION A. Battle Creek Elementary School (base scope): 1. Removal of the existing built-up roof system down to the existing roof deck throughout the entire building. Existing metal coping and associated items, such as scuppers and downspouts will also be removed as indicated on the drawings. 2. Removal of the existing steel structure over the gym roof supporting the photovoltaic (PV) system. PV panels are to be removed and salvaged for Owner’s disposal. 3. Installation of new air-and-vapor barrier on sections of the building with metal roof decking; the rest of the building is assumed to have a 2-ply built-up vapor retarder that can remain and be patched if necessary to maintain continuity. 4. Installation of a new 60-mil EPDM roofing system including new insulation and metal coping. New scuppers and downspouts will be installed where shown on the drawings. 5. In some cases, parapets will need to be extended to accommodate increase roof pitches and current minimum height requirements for the roofing system. 6. Work includes all demo, carpentry work, and insulation as detailed in the specifications and plans. 7. The building is approximately 70,000 square feet. B. Battle Creek Alternate: 1. Replace primary roof drains, leaders, risers and lambs tongues at the center section of the north classroom wing as shown on the mechanical drawings. 2. Add overflow roof drains, leaders, risers and lambs tongues at the same section of roof. C. Wellstone Elementary (base scope): 1. Removal of the existing built-up roof system down to the existing roof deck on the auxiliary gym on the north east corner of the building. Existing metal coping will also be removed. 2. The building is assumed to have a 2-ply built-up vapor retarder that can remain and be patched if necessary to maintain continuity. 3. Installation of a new built-up roofing system including new insulation and coping. Blocking at the parapet will need to be replaced to accommodate current minimum height requirements for the roofing system. 4. Work includes all demo, carpentry work, and insulation as detailed in the specifications and plans. 5. The auxilliary gym roof is approximately 4,500 square feet. Bid Security in the amount of 5% of the total bid amount (in the form of a bid bond or cashier’s check) is required for bids totaling $175,000 or more. Electronically submitted bids require a copy of the bid security to accompany submission. The Owner intends to recommend award of Contract on February 17, 2026 to the Board of Education (BOE). SPPS Purchasing will send the Contract to selected bidder after BOE award and processing is completed. Location - Battle Creek Elementary 60 Ruth Street South Saint Paul, MN 55119. Wellstone Elementary (gym only) 1041 Marion Street Saint Paul, MN 55117. PN - R25-5238.000

Bid Results

Educational

$3,468,628.00

Public - City

Renovation

29

13

15

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
301
Active Projects
166
Bidding Soon
1,574
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2026

June 12, 2026

Project location map

Multiple Locations, Saint Paul, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.