Published February 4, 2026 at 7:00 PM
Updated February 5, 2026
Renovation of a mixed-use development in Saint Paul, Minnesota. Completed plans call for the renovation of a 12,500-square-foot educational facility.
Question deadline is 01/23/2026 at 03:00 PM PROJECT DESCRIPTION A. Battle Creek Elementary School (base scope): 1. Removal of the existing built-up roof system down to the existing roof deck throughout the entire building. Existing metal coping and associated items, such as scuppers and downspouts will also be removed as indicated on the drawings. 2. Removal of the existing steel structure over the gym roof supporting the photovoltaic (PV) system. PV panels are to be removed and salvaged for Owner’s disposal. 3. Installation of new air-and-vapor barrier on sections of the building with metal roof decking; the rest of the building is assumed to have a 2-ply built-up vapor retarder that can remain and be patched if necessary to maintain continuity. 4. Installation of a new 60-mil EPDM roofing system including new insulation and metal coping. New scuppers and downspouts will be installed where shown on the drawings. 5. In some cases, parapets will need to be extended to accommodate increase roof pitches and current minimum height requirements for the roofing system. 6. Work includes all demo, carpentry work, and insulation as detailed in the specifications and plans. 7. The building is approximately 70,000 square feet. B. Battle Creek Alternate: 1. Replace primary roof drains, leaders, risers and lambs tongues at the center section of the north classroom wing as shown on the mechanical drawings. 2. Add overflow roof drains, leaders, risers and lambs tongues at the same section of roof. C. Wellstone Elementary (base scope): 1. Removal of the existing built-up roof system down to the existing roof deck on the auxiliary gym on the north east corner of the building. Existing metal coping will also be removed. 2. The building is assumed to have a 2-ply built-up vapor retarder that can remain and be patched if necessary to maintain continuity. 3. Installation of a new built-up roofing system including new insulation and coping. Blocking at the parapet will need to be replaced to accommodate current minimum height requirements for the roofing system. 4. Work includes all demo, carpentry work, and insulation as detailed in the specifications and plans. 5. The auxilliary gym roof is approximately 4,500 square feet. Bid Security in the amount of 5% of the total bid amount (in the form of a bid bond or cashier’s check) is required for bids totaling $175,000 or more. Electronically submitted bids require a copy of the bid security to accompany submission. The Owner intends to recommend award of Contract on February 17, 2026 to the Board of Education (BOE). SPPS Purchasing will send the Contract to selected bidder after BOE award and processing is completed. Location - Battle Creek Elementary 60 Ruth Street South Saint Paul, MN 55119. Wellstone Elementary (gym only) 1041 Marion Street Saint Paul, MN 55117. PN - R25-5238.000
Bid Results
Educational
$3,468,628.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 30, 2026
June 12, 2026
Multiple Locations, Saint Paul, MN
Related To This Project
Saint Paul, MN
Bid Date: Aug 14 2025
Saint Paul, MN
Bid Date: Sep 09 2025
Saint Paul, MN
Bid Date: Sep 04 2025
Saint Paul, MN
Bid Date: Aug 07 2025
Saint Paul, MN
Bid Date: Aug 22 2025
Saint Paul, MN
--
Saint Paul, MN
Bid Date: Aug 27 2025
Saint Paul, MN
Bid Date: Aug 14 2025
Saint Paul, MN
Bid Date: Aug 12 2025
Saint Paul, MN
Bid Date: Aug 01 2025
Saint Paul, MN
Bid Date: Aug 21 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.