Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 1, 2025 at 8:00 PM
Updated August 2, 2025
Site work for a playground / park / athletic field in Leonard, Michigan. Conceptual plans call for site work for a playground / park / athletic field.
Addison Township will seek grant opportunities to provide funding for this project. In order to do so, Addison Township requires a playground design with total cost of equipment, materials and labor. to seek grant opportunities, we seek firms to design a playground with total cost of equipment, materials and labor. The design and cost proposals will be presented to the Township Board for review and/or selection. Based on the design and cost selected, the Township Board will then seek funding. The project may commence when the funding, is secured. The Township will make every effort to complete this project using the selected firm based on the accepted design and proposal. Please include the time frame the proposal will be honored and the estimated escalated cost per year thereafter. Questions 248.628.3317 ext 216 Listed below are some of the perimeters. The Township is open to your professional opinion and design. 1. Playground equipment in the highlighted area (attached). 2. Possible area by fence line for standalone equipment, swings etc. 3. Include inclusive activities and/or equipment. 4. Playground surface, turf. You may quote for both turf or rubber surface, meeting all ADA requirements. 5. Bright colors inviting to the youth. 6. Playground equipment for ages 2-5 and 5-12. 7. If possible, an area for a few swings. The Township reserves the right to reject any or all written proposals, in whole or in part, and waive any irregularities therein. The proposals may be awarded, rejected or re-advertised at the sole discretion of the Township. Addison Township has, and expressly reserves, the right to accept or reject any or all written proposals without cause and at the Township's sole discretion. Proposers agree and acknowledge that, by submitting a written proposal, proposer waives any claim against Addison Township for costs or fees incurred in this RFP process. The method of Contractor Selection has not been Determined at this time.
Conceptual
Playgrounds / Parks / Athletic Fields
$500,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2026
1440 Rochester Rd, Leonard, MI
Related To This Project
Leonard, MI
Bid Date: Jun 17 2025
Leonard, MI
Bid Date: Jan 16 2025
Leonard, MI
Bid Date: Dec 10 2024
Leonard, MI
Bid Date: Sep 17 2024
Leonard, MI
Bid Date: Jul 27 2023
Leonard, MI
Bid Date: Mar 05 2020
Leonard, MI
Bid Date: Oct 04 2022
Leonard, MI
Bid Date: Sep 21 2022
Niles, MI
Bid Date: Nov 17 2025
Marquette, MI
Bid Date: Aug 01 2025
Allegan, MI
Bid Date: Aug 27 2025
Caro, MI
Bid Date: Aug 14 2025
Alpena, MI
Bid Date: Aug 12 2025
Ray, MI
Bid Date: Aug 21 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
