BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 11, 2025 at 8:00 PM

Updated September 12, 2025

Renovation of a playground / park / athletic field in Elmhurst, Illinois. Completed plans call for the renovation of a playground / park / athletic field.

Any comments or ques tions must be submit ted to theArchi tect no later than Thurs day, August 21, 2025, by12:00 p.m. local time. Owners’ repre sen ta tive AngelaFerrentino, Direc tor of Refer en dum ProjectConstruc tion, email: afer rentino@epd.org. Any clar ifi ca tions or revi sions to the construc tion docu mentswill be issued by the Archi tect in the form of anAdden dum. . Bids will be held good and may notbe with drawn for a period of 60 calen dar days fromthe date of receipt. Project approval is antic i pated tooccur at the next sched uled Park District meet ingfollow ing bid open ing. Commence ment of the work on the project shall besubject to the discre tion of Owner. The Ownerreserves the right to waive any irreg u lar i ties and toaccept any or reject all bids when, in the opin ion of theOwner, such action will serve the best inter est of theOwner. A general description of this project is as follows (not to be taken as a complete description or extent of the work): Project consists of a new restroom facility including plumbing, mechanical and electrical systems. New work includes but is not limited to: masonry, wood framing, metal roofing, interior finishes including drywall and painting, and site utilities. 1. If identified in the bid form, the Contractor shall provide, erect, maintain and remove temporary fencing required to protect all existing vegetation identified by the Contract Documents and/or the Owner's Representative. Provide root pruning of existing trees that are affected by the execution of the Work. 2. The Contractor shall be responsible for any violation as established by this section and shall be subject to the fines as stated in the Schedule of Fines. 3. Construction shall not commence before completion of Logistics Plan and construction schedule and Owner's representative approval of protective barrier in accordance with standard tree protecting detail provided by the City of Elmhurst.

Award

Playgrounds / Parks / Athletic Fields

$487,777.00

Public - City

Renovation

38

17

17

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
457
Active Projects
247
Bidding Soon
3,367
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2025

September 4, 2025

Project location map

363 Commonwealth Ln, Elmhurst, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.