Published September 30, 2025 at 8:00 PM
Updated October 1, 2025
Site work and paving for a mixed-use development in Green Bay, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Project Description: The project includes the removal, abandonment, and repla 5,600 LF of water main, 6,200 LF of sanitary sewer, 2,500 LF water laterals and 2,500 LF of sanitary laterals, patching of asphalt pavement, curb and gutter, driveways, sidewalks, and landscaping on STH 22. The project also includes approximately 400 LF of watermain boring and 130 liner feet of watermain between W Cedar Street and Pine Street. The project shall be completed in accordance with the plans and specifications. Question Deadline 08/12/2025 Contact information and submittal procedures for such questions are as follows Project Manager/Engineer Contact at Robert E. Lee & Associates, Inc. is Jennifer Liimatta, P.E. via email: jliimatta@releeinc.com Questions received less than seven days prior to the date for opening of Bids may not be answered Prequalifications are due to engineer via email lreschke@releeinc.com 5 calendar days prior to bid date. This project is subject to the Build America, Buy America Act. Davis Bacon Wage Rates have ben included for htis project for the WisDOT's compensable itesm (water mains hydrants). Pre-Qualification: Yes The owner encourages DBEs including MBEs and WBEs to submit bid proposals. Domestic Preference This project is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. 117-58, 70901-70953. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States. The following waivers apply to this Contract: o BABAA De Minimis, Small Grants, and Minor Components Davis Bacon Wage Rates have been included for this project have for the WisDOT's compensable items (water main hydrants).
Award
Water / Sewer
$3,253,550.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 19, 2025
October 20, 2025
Utility St, Green Bay, WI
Related To This Project
Green Bay, WI
Bid Date: Aug 21 2025
Green Bay, WI
Bid Date: Aug 26 2025
Green Bay, WI
Bid Date: Aug 19 2025
Green Bay, WI
Bid Date: Jan 09 2026
Green Bay, WI
--
Green Bay, WI
Bid Date: Aug 19 2025
Green Bay, WI
Bid Date: Aug 29 2025
Green Bay, WI
Bid Date: Sep 02 2025
Green Bay, WI
Bid Date: Sep 04 2025
Green Bay, WI
Bid Date: Aug 08 2025
Green Bay, WI
Bid Date: Aug 18 2025
Green Bay, WI
Bid Date: Aug 19 2025
Green Bay, WI
Bid Date: Aug 19 2025
Green Bay, WI
Bid Date: Aug 19 2025
Green Bay, WI
Bid Date: Aug 21 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.