Published September 30, 2025 at 8:00 PM

Updated October 1, 2025

Site work and paving for a mixed-use development in Green Bay, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Project Description: The project includes the removal, abandonment, and repla 5,600 LF of water main, 6,200 LF of sanitary sewer, 2,500 LF water laterals and 2,500 LF of sanitary laterals, patching of asphalt pavement, curb and gutter, driveways, sidewalks, and landscaping on STH 22. The project also includes approximately 400 LF of watermain boring and 130 liner feet of watermain between W Cedar Street and Pine Street. The project shall be completed in accordance with the plans and specifications. Question Deadline 08/12/2025 Contact information and submittal procedures for such questions are as follows Project Manager/Engineer Contact at Robert E. Lee & Associates, Inc. is Jennifer Liimatta, P.E. via email: jliimatta@releeinc.com Questions received less than seven days prior to the date for opening of Bids may not be answered Prequalifications are due to engineer via email lreschke@releeinc.com 5 calendar days prior to bid date. This project is subject to the Build America, Buy America Act. Davis Bacon Wage Rates have ben included for htis project for the WisDOT's compensable itesm (water mains hydrants). Pre-Qualification: Yes The owner encourages DBEs including MBEs and WBEs to submit bid proposals. Domestic Preference This project is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. 117-58, 70901-70953. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States. The following waivers apply to this Contract: o BABAA De Minimis, Small Grants, and Minor Components Davis Bacon Wage Rates have been included for this project have for the WisDOT's compensable items (water main hydrants).

Award

Water / Sewer

$3,253,550.00

Public - City

Paving, Site Work

41

18

6

7

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
30
Bidding Soon
447
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2025

October 20, 2025

Project location map

Utility St, Green Bay, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.