Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 4, 2025 at 8:00 PM
Updated August 5, 2025
This is a service / maintenance or supply contract in Alhambra, California. Contact the soliciting agency for additional information.
The City of Alhambra's Utilities Department sanitary sewer system is made up of a network of gravity sewers, pump stations, and forced mains. The gravity system consists of approximately 129 miles of pipe, 2800 manholes, and seven lift stations with 7,800 feet of forced mains. The City of Alhambra is requesting a proposal from your firm for professional engineering services to update the Sewer Master Plan, A copy of the Request for Proposals (RFP) is attached for your review and consideration. The Sewer Master Plan is to provide an evaluation of the City's sewer collection system and to provide a framework for undertaking the construction of new and replacement facilities in an effective manner. The City's most recent Sewer Master Plan was prepared in 2007. The Sewer Master Plan evaluates the capacity and condition of the City's sanitary sewer system and establishes the basis for the City's ten-year sewer system Capital Improvement Program (CIP). September 4, 2025 Review of Proposals September 22, 2025 Contract Award by the City Council October 20, 2025 Execution of Contract and Notice to Proceed Question Deadline 08/14/2025 Should you have any questions please feel free to contact Thomas Amare, Engineering Project Specialist at (626) 300-1562 or at tamare@alhambraca.gov. Submit Written Questions to the City. The City of Alhambra reserves the right to adjust this schedule as necessary. The City of Alhambra reserves the right to accept or reject any or all Proposals, to be the sole judge of the merits and qualifications of the services and/or items offered and the ability of Proposer to responsibly perform. The City reserves the right to waive any irregularities or informalities in any Proposal submitted or in the procedure. An award of contract may be made to other than the firm offering the lowest costs. Proposal may not be withdrawn for a period of sixty (60) days after the time Proposals are due. The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2025
Multiple Locations, Alhambra, CA
Related To This Project
Alhambra, CA
Bid Date: Sep 02 2025
Alhambra, CA
--
Alhambra, CA
Bid Date: Sep 02 2025
Alhambra, CA
Bid Date: Sep 18 2025
Alhambra, CA
Bid Date: Sep 25 2025
Alhambra, CA
Bid Date: Dec 04 2025
Alhambra, CA
Bid Date: Sep 10 2025
Alhambra, CA
Bid Date: Aug 12 2025
Alhambra, CA
Bid Date: Aug 12 2025
Alhambra, CA
Bid Date: Jul 16 2025
Alhambra, CA
Bid Date: Jul 31 2025
Alhambra, CA
Bid Date: Jun 30 2025
Alhambra, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
