Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 4, 2025 at 8:00 PM

Updated August 5, 2025

This is a service / maintenance or supply contract in Morton, Illinois. Contact the soliciting agency for additional information.

This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts The Complexity Factor for this project is 0. The Phase I work may consist of conducting route surveys, land surveys, hydraulic surveys, hydraulic analyses, geometric studies, and preparing Project Reports anticipated to be Categorical Exclusions. This work may include data collection, development of alignment alternatives, cost estimates, ADA, traffic management analysis, crash analyses, Type, Size and Location (TS&L) drawings, structure plans, public involvement activities, environmental tasks, surveys, ROW documents and other related work and prepare exhibits necessary to produce the Project Report. The Phase II work, if required, may consist of conducting route surveys, land surveys, hydraulic analyses, geometric studies, and preparation of TS&L drawings, structure plans, roadway plans, and any other related work to complete final plans, special provisions, and estimates.. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 29 - RFQ - Various Phase I/II Projects, Various Routes, Various Counties

Conceptual

Roads / Highways

$2,500,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2026

Project location map

Multiple Locations, Morton, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed