BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 4, 2025 at 8:00 PM

Updated August 5, 2025

This is a service / maintenance or supply contract in Morton, Illinois. Contact the soliciting agency for additional information.

This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. Phase I/II engineering services are required for various projects throughout District Three. The work is anticipated to include an emphasis on traffic capacity analysis and safety studies. This work may include collection of traffic data, vehicle classification, turning movements, pedestrian and bicycle usage, and existing roadway geometry. This work is also expected to include development of travel demand models, projecting future traffic volumes, predicting future Level of Service values, and other related tasks. In addition, this work may include performing safety reviews of intersections and roadway segments. Studies are anticipated to include recommended proposed improvements to increase safety and accommodate predicted multi-modal travel demand. It is estimated that this will be approximately 40% of the overall contract value. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Freeways) Location Design Studies (Rehabilitation) Special Studies (Traffic Studies) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS) ILDOT - 32 - RFQ - Various Phase I/II Projects, Various Routes

Conceptual

Roads / Highways

$3,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
79
Bidding Soon
1,252
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.