Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 19, 2025 at 8:00 PM
Updated September 20, 2025
Site work and paving for a bridge / tunnel in Corinth, Mississippi. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
This work shall consist of the removal of bridge deck concrete using hydrodemolition equipment as preparation for bridge deck repairs or overlay. Rotomilling of the existing concrete deck prior to hydrodemolition will not be allowed. All work shall be performed in accordance with the details shown on the plans or as directed by the Engineer. Bridge Repair on US 72 over KCS Railroad (Bridge No. 64.4), known as Federal Aid Project No. NHPP-0007-01(103) / 109671301 in Alcorn County. Project Completion : 145 Working Days Value Estimate Range - $1,000,000 - $5,000,000 For Federal Aid Projects the attention of bidders is directed to the contract provisions governing selection and employment of labor contained in the bid proposal. Minimum wage rates for Federal Aid Projects have been predetermined by the Secretary of Labor and are subject to Public Law 87-581, Work Hours Act of 1962, as set forth in the contract provisions. Unless otherwise set out in the bid proposal, all other projects are subject to the predetermined minimum wage rate set by the U.S. Department of Labor under the Fair Labor Standards Act. When a DBE goal is contained in the contract, the award will be contingent upon the Contractor satisfying the DBE requirements. Bid bond, signed or countersigned by a Mississippi Resident Agent or qualified non-resident agent, with Power of Attorney attached or on file with the Contract Administration Engineer of the Department, a Cashier's Check or Certified Check for five (5%) percent of bid, payable to State of Mississippi, must accompany each proposal. The attention of bidders is directed to the provisions of Subsection 102.07 pertaining to irregular proposals and rejection of bids. MSDOT - Call 01 - Bridge Repair on US 72 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$1,492,233.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 26, 2025
October 9, 2025
US-72, Corinth, MS
Related To This Project
Corinth, MS
Bid Date: Sep 12 2025
Corinth, MS
Bid Date: Nov 26 2025
Corinth, MS
Bid Date: Nov 18 2025
Corinth, MS
Bid Date: Dec 29 2025
Corinth, MS
Bid Date: Aug 12 2025
Corinth, MS
Bid Date: Aug 19 2025
Corinth, MS
Bid Date: Jul 21 2025
Corinth, MS
Bid Date: Jul 29 2025
Corinth, MS
Bid Date: Jul 29 2025
Corinth, MS
Bid Date: Jul 15 2025
Corinth, MS
Bid Date: May 30 2025
Corinth, MS
Bid Date: Jun 05 2025
Corinth, MS
Bid Date: Jun 05 2025
Corinth, MS
Bid Date: Jun 05 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
