Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 6, 2025 at 8:00 PM
Updated August 7, 2025
This is a service / maintenance or supply contract in Alameda, California. Contact the soliciting agency for additional information.
The City of Alameda is pleased to release the RFP for a Waterway Study for the Oakland-Alameda Estuary Bridge Project. The City seeks to retain a consultant or consultant team to provide professional engineering services for a Waterway Study (Project) for a future Oakland Alameda Estuary Bridge project (Estuary Bridge). The Estuary Bridge is envisioned to be a moveable pedestrian/bicycle bridge connecting western Alameda and Jack London Square in Oakland. A Project Study Report-Project Development Support (PSR-PDS) for the Estuary Bridge was completed in June 2024, which identified the need for a Waterway Study of the Oakland Estuary. The Project will assess the existing type, volume, frequency, operations and timing of vessels that traverse the Estuary in the project area. The major deliverables of the Study include comprehensive data on the vessels using the Estuary and desktop simulations of multiple potential bridge locations identified in the PSR-PDS, which will allow the development of the height and width parameters for a potential bridge. The Study will be used to inform the options studied in the next major phase of the Estuary Bridge project, the Environmental phase. This contract will be primarily funded by a Caltrans Sustainable Communities grant (Caltrans-City "Restricted Grant Agreement" or "RGA"). All grant conditions imposed on the City by the RGA will also apply to the selected consultant. Question Deadline 08/12/2025 at 5:00 PM PT Answers to written questions posted By August 14, 2025. All questions must be submitted in writing and will be accepted. Please email them to: Rochelle Wheeler, Senior Transportation Coordinator, rwheeler@alamedaca.gov. The Waterway Study will be managed by the City, in close coordination with the key Project partners for this phase: the City of Oakland and the U.S. Coast Guard (USCG). The City seeks to have the Project completed before June 30, 2027. The City reserves the right to alter the above schedule, as necessary. The method of Contractor Selection has not been Determined at this time.
Conceptual
Bridges / Tunnels
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2025
To Be Determined, Alameda, CA
Related To This Project
Alameda, CA
Bid Date: Aug 25 2025
Alameda, CA
Bid Date: Aug 28 2025
Alameda, CA
Bid Date: Jan 30 2026
Alameda, CA
Bid Date: Sep 16 2025
Alameda, CA
Bid Date: Sep 16 2025
Alameda, CA
Bid Date: Sep 23 2025
Alameda, CA
Bid Date: Sep 12 2025
Alameda, CA
Bid Date: Sep 10 2025
Alameda, CA
Bid Date: Aug 19 2025
Alameda, CA
Bid Date: Aug 19 2025
Alameda, CA
Bid Date: Jul 18 2025
Alameda, CA
Bid Date: Jul 22 2025
Alameda, CA
--
Alameda, CA
Bid Date: Aug 05 2025
Alameda, CA
Bid Date: Aug 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
