Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 16, 2025 at 8:00 PM
Updated September 17, 2025
This is a service / maintenance or supply contract in Bunnell, Florida. Contact the soliciting agency for additional information.
Flagler County Board of County Commissioners is seeking qualified firms to submit competitive sealed Statements of Qualifications (RSQs) to provide Construction, Engineering & Inspection (CEI) services. These services will support two Design-Build capital improvement projects and include pay app certification, quality assurance, inspection, materials sampling, testing, monitoring, plan review, schedule review, progress meeting and reporting, as well as any required State threshold inspections. All work must comply with project design documents, contract requirements, and Flagler County standards. Question Submission Deadline :August 22, 2025, 12:00pm Evaluation Committee Meeting: Week of September 8, 2025 Shortlisted Firms Presentations/Discussions (if required):Week of September 15, 2025 Flagler BOCC Approval to Award with Top Ranked Firms: October 6, 2025. The selected Consultant Firm will serve as Flagler County's representative for assigned construction projects and faithfully represent the County's interest in all matters, with special emphasis given to issues involving quality of the work. Exercise independent professional judgment in performing obligations and responsibilities under this Agreement. The scope of work includes construction engineering & inspection (CEI) services to support the County's specified Progressive Design-Build projects. The selected Consultant Firm will support the County in developing a specific scope of services for each project and detailed within the Work Authorization developed by the County and Consultant. The general objective is for the selected firm/team to be capable of providing project administration assistance, possibly including but not limited to review of major equipment submittals, inspection of Design-Build Firm's QA/QC documentation and verification of materials sampling and testing for the construction project as assigned on a per project basis in accordance with the design, regulatory permits, contract documents and County, State, and Federal standards and requirements. Required completion of the project is June 30, 2026 to support receipt of Grant funding which will be used to pay for this facility. Flagler County is seeking to contract with one (1) firm to provide services for various projects on an assigned, as-needed basis. Flagler County reserves the right to award to fewer or greater number of firms at its discretion. Flagler County is seeking to contract with one (1) firm to provide services for the projects listed above on an assigned, as-needed basis. Flagler County reserves the right to award to none of the firms or more than one of firms at its discretion. The Flagler County Board of County Commissioners reserves the right to consider the omission of an acknowledgement of addendum as cause for rejection of the RSQ submittal. This provision exists solely for the convenience and administrative efficiency of Flagler County. No Proposer or other third party shall gain any rights by virtue of this provision or the application thereof, nor shall any proposer or third party have any standing to sue or cause of action arising there from. The method of Contractor Selection has not been Determined at this time.
Conceptual
Municipal
Public - County
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2026
Multiple Locations, Bunnell, FL
Related To This Project
Bunnell, FL
Bid Date: Sep 03 2025
Bunnell, FL
Bid Date: Sep 05 2025
Bunnell, FL
Bid Date: Sep 16 2025
Bunnell, FL
Bid Date: Sep 16 2025
Bunnell, FL
Bid Date: Sep 30 2025
Bunnell, FL
--
Bunnell, FL
Bid Date: Oct 15 2025
Bunnell, FL
--
Bunnell, FL
--
Bunnell, FL
Bid Date: Jul 30 2025
Bunnell, FL
Bid Date: Jul 10 2025
Bunnell, FL
Bid Date: Jul 23 2025
Bunnell, FL
Bid Date: Jun 24 2025
Bunnell, FL
Bid Date: Feb 12 2021
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
