Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 8, 2025 at 8:00 PM
Updated August 29, 2025
Renovation of a clubhouse / community center in Iqaluit, Nunavut. Completed plans call for the renovation of a clubhouse / community center.
Reference Number 0000299929 Question Acceptance Deadline 2025/08/21 03:00:00 PM EDT Pricing Lump sum The City of Iqaluit is seeking to retain construction services to install new lobby flooring at the Curling Rink building. The Scope of Work of the Project is for the Complete Removal, Preparation, Installation, and Finishing of New Marmoleum Flooring in the Lobby of the Iqaluit Curling Rink. The Contractor Shall Provide All Labor, Materials, and Equipment Necessary to Complete the Following Work at Each Site in Accordance With Applicable City of Iqaluit Standards and the Ontario Building Code (Obc). The Work Includes Demolition and Removal of Existing Flooring, Subfloor Preparation, Supply and Installation of Marmoleum Flooring, Finishing, Cleanup, and Delivery of All Associated Documentation and Warranties. Demolition and Removal 1. 1.1. Remove Existing Flooring Materials (E.g., Carpet, Tile, or Vinyl). 1.2. Properly Dispose of All Debris in Accordance With Local Regulations. 1.3. Inspect the Subfloor for Damage or Irregularities. 2. Subfloor Preparation 2.1. Clean and Level the Subfloor. 2.2. Repair Any Cracks, Holes, or Uneven Areas. 2.3. Apply Primer or Underlayment as Needed for Marmoleum Adhesion. 3. Marmoleum Installation 3.1. Supply and Install Marmoleum Flooring. 3.2. Cut and Fit Marmoleum to the Dimensions of the Lobby, Including Around Fixed Objects. 3.3. Heat-weld Seams (if Applicable) for a Seamless, Water-resistant Finish. 3.4. Install Cove Base and Transition Strips as Needed. 4. Finishing and Cleanup 4.1. Inspect the Installation for Quality and Completeness. 4.2. Clean the Work Area and Remove All Tools, Materials, and Waste. 4.3. Provide Maintenance and Care Instructions for the New Flooring. 5. Deliverables 5.1. Professionally Installed Marmoleum Flooring in the Curling Rink Lobby. 5.2. Maintenance and Care Instructions for the New Flooring 5.3. Warranty Documentation for Materials and Workmanship. 6. Timeline 6.1. The Facility Will Be Occupied for a Summer Day Camp Program Until August 22nd, After Which Preparations for the Curling Season Will Begin. The Curling Season is Scheduled to Commence With Events on October 15th and 16th. To Accommodate This Schedule, the Selected Contractor is Required to Mobilize on-site No Later Than September 10th, 2025. All Work, Including the Complete Installation of the New Lobby Flooring, Must Be Finalized by October 6th, 2025. Contractors Must Plan Their Work to Ensure Minimal Disruption to Facility Official bid documents must be obtained from www.merx.com
Post-Bid
Clubhouse / Community Centers
$400,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2025
September 29, 2025
4 Niaqunngusiariaq, Iqaluit, NU
Related To This Project
Iqaluit, NU
Bid Date: Aug 14 2025
Iqaluit, NU
Bid Date: Aug 27 2025
Iqaluit, NU
--
Iqaluit, NU
--
Iqaluit, NU
Bid Date: Sep 05 2025
Iqaluit, NU
Bid Date: Sep 12 2025
Iqaluit, NU
Bid Date: Sep 30 2025
Iqaluit, NU
Bid Date: Aug 13 2025
Iqaluit, NU
Bid Date: Jul 31 2025
Iqaluit, NU
--
Iqaluit, NU
--
Iqaluit, NU
Bid Date: Aug 15 2025
Iqaluit, NU
Bid Date: Jul 25 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
