Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 1, 2025 at 8:00 PM

Updated September 2, 2025

Renovation of a military facility in Eglin, Florida. Completed plans call for the renovation of a military facility.

Amendment 1 The SOW has been Updated (highlighted yellow) see attached A new Site Visit has been scheduled for Friday 15 August 2025 Added (Questions and Answers 1) in attachments The Preferred Carpet type is in the Pricing Form Attached It is a 6 inch Cove Base AFTC/PZICA at Eglin Air Force Base requires the removal of existing carpet and vinyl base in designated areas on the third floor of Building 350 (SEEK EAGLE) and the installation of new carpet squares/tiles and rubber base. The project will be executed in phases due to asbestos abatement, with a focus on minimizing disruption, adhering to safety standards, and complying with applicable NFPA and UFC requirements. All carpet and adhesive materials must be sourced exclusively through approved Tier I Contractors, and installation services must be coordinated accordingly. Offerors must submit a complete proposal in PDF format, along with a separate, fully completed Price Document, by 1300 CT on 25 August 2025. Proposals must include detailed pricing for carpet, adhesive, and installation (including shipping), and demonstrate understanding of the Statement of Work and Evaluation Factors. Offerors must be actively registered in SAM at the time of submission and throughout the contract period. Location: Eglin Air Force Base, Building 350, 3rd Floor, 100 Museum Drive, Building #2938, Eglin AFB, FL 32542. QA: All Materials and Carpet will not be delivered to Eglin AFB straight from manufacturer and shall be brought on by the awardee of said task order. There is a back entrance to the facility utilized as a contractors area that has ample space to load and unload equipment and materials. The Government will not provide any handling equipment or forklifts to unload or move carpet to the 3rd floor of building 350. The Government will not provide any handling equipment or forklifts to unload or move carpet or installation materials to the 3rd floor of building 350.

Post-Bid

Military

$10,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
54
Bidding Soon
902
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2025

September 25, 2025

Project location map

100 Museum Dr, Eglin, FL


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed