BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 8, 2025 at 8:00 PM

Updated October 9, 2025

Site work for a water / sewer project in Kissimmee, Florida. Completed plans call for site work for a water / sewer project.

**As of October 8, 2025 , This project has been awarded to Evoqua Water Technologies LLC was awarded the contract for $137,933.40.** Odor Control System for Lift Station P004 Question Deadline 08/28/2025 at 5:00 PM ET All questions concerning this Bid and/or the procurement process must be directed electronically through Bonfire The Contractor shall provide Odor Control Services for Lift Station P-004 to mitigate hydrogen sulfide (H2S) and other odor -causing compounds generated in Wastewater Treatment operations. The system shall be a biological treatment solution designed for efficient and sustainable odor control performance. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to supply the services and complete the work in accordance with the specifications. The work shall include, but not be limited to, the services outlined below. Due to space limitations and accessibility requirements, the Odor Control System shall not exceed dimensions of 7 feet in length, 5 feet in width, and 8 feet in height. (7'L x 5'W x 8'H.) Description Quantity 1. Fully assembled, pre-packaged, hybrid Biological Odor Control System including: 1 Biogas media for treatment of inorganic odors (H2S). VOCarb 36C media for treatment of inorganic and organic odors. Humidification/irrigation system including nozzle and internal piping. Access manway, ports, drain, and removable top. Integral Nutrient Reservoir. Electrical Control Panel, NEMA 4X, mounted on equipment skid, Relay Based Logic with Fan Switches, Variable Frequency Drive (VFD), vent fan / filter, water valve switch, and water valve timer relay. Water Control Cabinet, constructed from a NEMA 4X FRP Enclosure, mounted on equipment skid, with irrigation solenoid valve, rotameter, nutrient feed pump, nutrient injection point, control valves, water pressure control valve, and pressure gauge. Initial fill of nutrient for three (3) months' supply. Freight. Included Manufacturer services for Start-up. Included

Award

Water / Sewer

$137,933.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
381
Active Projects
157
Bidding Soon
2,520
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

November 1, 2025

Project location map

To Be Determined, Kissimmee, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.