BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Renovation of a municipal facility in North Brunswick, New Jersey. Completed plans call for the renovation of a municipal facility.

The Township of North Brunswick is looking to renovate the men's and women's locker room and bathroom facilities at its Public Works Building (45 Quarry Lane). The existing bathrooms are original to the building. Renovations include tiling, painting, upgrading some fixtures, and installing new lockers Question Deadline 08/15/2025 at 4:00 PM ET a written request must be received at least three (3) business days prior to the date fixed for the opening: Justine Progebin, Business Administrator, Township of North Brunswick 710 Hermann Road North Brunswick, NJ 08902 732-247-0922 Ext. 480 jprogebin@northbrunswicknj.gov The Township of North Brunswick is looking to renovate the men's and women's locker room and bathroom facilities at its Public Works Building (45 Quarry Lane). The existing bathrooms are original to the building. Renovations include tiling, painting, upgrading some fixtures, and installing new lockers. Vendors interested in visiting the site should reach out to Steve Bloyed at sbloyed@northbrunswicknj.gov to schedule an appointment. No questions will be answered during a site visit; all questions should be asked on the Q&A tab of this solicitation. Men's Locker Room o Completely remove existing commercial grade round wash basin including lockers. o Remove existing drop (suspended) ceiling including gridwork & install new 2'x4' gridwork w/ tiles. o Expand opening of doorway to 76" that leads from Locker Room to Restroom. o Apply spackle to any holes or imperfections of wall structure. Sand smooth upon completion. o Install 3-1/4" Wood Primed Finger-Jointed Base Molding around entire perimeter. *Where lockers are not located. o Apply (1) coat primer throughout walls. Color: White. o Apply (2) coats of interior paint by BEHR to walls. Color: TBD, Finish: Eggshell. o Apply (2) coats of interior ceiling paint by BEHR to walls. Color: White, Finish: Flat. o Apply (2) coats of interior paint by BEHR to all moldings. Color: o White, Finish: Semi-Gloss. o Apply (2) coats of interior metal paint by BEHR to all metal door trim & door slabs. Color: TBD, Finish: SemiGloss. o Remove & replace existing HVAC vent covers & replace w/ new. o Color: White. o Install new 9"x17" (lengths TBD) benches to coincide w/ locker room layout. o Install (59) single tier 12" W x 78" H lockers w/ base plates. Electrical o Remove (4) existing 2'x4' fluorescent light fixtures & replace w/ (4) LED flat panel light fixtures. o Replace existing light switches. o Remove & eliminate existing wall heater. o Remove & eliminate single emergency light. o Install new emergency exit light device at entry doorway. Men's Restroom o Completely remove all partitions, plumbing fixtures, sinks etc. Remove existing drop (suspended) ceiling including gridwork & install new 2'x4' gridwork w/ tiles. o Apply spackle to any holes or imperfections of wall structure. o Sand smooth upon completion. o Install 3-1/4" Wood Primed Finger-Jointed Base Molding around entire perimeter. o Apply (1) coat primer throughout walls. Color: White. Apply (2) coats of interior paint by BEHR to walls. Color: TBD, Finish: Eggshell. o Apply (2) coats of interior ceiling paint by BEHR. Color: White, Finish: Flat. o Apply (2) coats of interior paint by BEHR to all moldings. Color: White, Finish: Semi-Gloss. o Apply (2) coats of interior metal paint by BEHR to all metal door trim & door slabs. Color: TBD, Finish: SemiGloss. o Remove & replace existing HVAC vent covers & replace w/ new. o Color: White. o Install (2) 1.6 GPF Flush One-Piece Elongated Right Height Toilet w/ Seat & Flushometer by American Standard or equivalent & make all necessary drainage & water supply connections. o *Specifications TBD. o Remove & replace (2) existing wall mount urinals w/ Chrome motion sensor flush valves & make all necessary drainage & water supply connections. *Specifications TBD. o Coordinate solid surface countertop installation w/ (2) sink cut outs. *Price/material not included. o Install new undermount stainless steel sinks & make all necessary drainage & water supply connections. Stall Partitions o Supply & install (2) toilet compartment(s) w/ door(s), (1) standard stall, (1) ADA stall. Color: Gray. o Supply & install (2) wall mounted vertical liquid soap dispenser. Supply & install (2) double roll toilet paper dispenser, Supply & install (2) mirrors. o Supply & install (1) urinal screen. Shower Enclosure o Completely demo existing shower enclosure down to exposed studs including floor. o Add blocking & reinforce areas where potential grab bars & bench could be installed. o Change-out existing shower fixture for new. (i.e. Shower head & diverter/control valve, drain), Finish: Chrome. o Install new 5/8" Gypsum Board throughout all walls & ceiling. Apply (2) coats of interior ceiling paint by BEHR. Color: White, Finish: Flat. o Install 160 SF of ceramic tile in a straight pattern throughout shower enclosure walls. Grout upon completion. o Install (1) marble corner shelf or equivalent. o Install 48 SF of ceramic floor tile in a straight pattern throughout shower floor. Grout upon completion. Electrical o Remove (2) existing 2x4' fluorescent light fixtures & replace w/ (2) LED flat panel light fixtures. o Replace existing light switches & receptacle outlets. [CFC/ included) Remove & eliminate existing wall heater. o install new emergency exit light device at doorway. Install (2) new LED 6" recessed light fixtures within shower enclosure. o Install (1) Xlerator Electric Hand Dryer, High Speed, Chrome o Plated Zinc Cover w/ 1.1 Noise Reduction Nozzle or equivalent. Women's Restroom/Locker Room o Completely remove all partitions, plumbing fixtures, sinks etc. Remove existing drop (suspended) ceiling including gridwork & install new 2'x4 Jgridwork w/ tiles. o Apply spackle to any holes or imperfections of wall structure. o Sand smooth upon completion. o Cut back partition wall 7" nearest entry door to create 36" clearance opening leading to sink area. o Install 3-1/4" Wood Primed Finger-Jointed Base Molding around entire perimeter. o Apply (1) coat primer throughout walls. Color: White. Apply (2) coats of interior paint by BEHR to walls. Color: TBD, Finish: Eggshell. o Apply (2) coats of interior ceiling paint by BEHR. Color: White, Finish: Flat. o Apply (2) coats of interior paint by BEHR to all moldings. Color: White, Finish: Semi-Gloss. o Apply (2) coats of interior metal paint by BEHR to all metal door trim & door slabs. Color: TBD, Finish: SemiGloss. o Remove & replace existing HVAC vent covers & replace w/ new. Color: White. o Install (2) 1.6 GPF Flush One-Piece Elongated Right Height Toilet w/ Seat & Flushometer by American Standard or equivalent & make all necessary drainage & water supply connections. o Install (4) single tier 12" W x 78" H lockers w/ base plates. Stall Partitions o Supply & install (2) toilet compartment(s) w/ door(s), (1) standard stall, (1) ADA stall. Color: Gray. o Supply & install (2) wall mounted vertical liquid soap dispenser. o Supply & install (2) double roll toilet paper dispenser. Supply & install (2) mirrors. Shower Enclosure o Completely demo existing shower enclosure down to exposed studs including floor. o Add blocking & reinforce areas where potential grab bars & bench could be installed. o Change-out existing shower fixture for new. (i.e. Shower head & diverter/control valve, drain). Finish: Chrome. o Install new 5/8" Gypsum Board throughout all walls & ceiling. Apply (2) coats of interior ceiling paint by BEHR. Color: White, Finish: Flat. o Install 176 SF of ceramic tile in a straight pattern throughout shower enclosure walls. Grout upon completion. nstall (1) marble corner shelf or equivalent. o Install 48 SF of ceramic floor tile in a straight pattern throughout shower floor. Grout upon completion. Electrical o Remove (3) existing 2'x4' fluorescent light fixtures & replace w/ (3) LED flat panel light fixtures. o Replace existing light switches & receptacle outlets. (GFCI included) Remove & eliminate existing wall heater. o Install (2) new emergency exit light device at doorway(s). Install (2) new LED 6" recessed light fixtures within shower enclosure. o Install (1) Xlerator Electric Hand Dryer, High Speed, Chrome o Plated Zinc Cover w/ 1.1 Noise Reduction Nozzle or equivalent Respondents are required to comply with the requirements of PL 1975 c. 127. (N.J.A.C. 17:27) and N.J.S.A. 10:5-31 et seq. The successful respondent shall be required to comply with the provisions of the New Jersey prevailing Wage Act, Chapter 150 of the Laws of 1963, effective January 1,1974.

Award

Municipal

$145,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
998
Active Projects
551
Bidding Soon
7,669
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2025

September 22, 2025

Project location map

45 Quarry Ln, North Brunswick, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.