Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 11, 2025 at 8:00 PM
Updated August 13, 2025
Site work and paving for a mixed-use development in Tukwila, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Design and construct major road improvements on S Ryan Way from east of Martin Luther King, Jr. Way to east City limits. Project will include full overlay/roadway reconstruction, re-channelization to a 3-lane roadway section with protected bike lanes, new and/or replacement sidewalk and curb ramps to meet ADA requirements, enhanced pedestrian crossings, intersection realignment at 47th Ave S/S 107th St, and new illumination. New water for project length and new sewer main to extend existing sewer limits. New drainage system for length of project with treatment and detention. Undergrounding of certain overhead utilities may be included. New walls may be required for sidewalk construction. ROW acquisition will be necessary. As of Aug 12, 2025, this project is included in the City's 2025-2030 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$9,960,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2027
S Ryan Wy, Tukwila, WA
Related To This Project
Tukwila, WA
Bid Date: Sep 11 2025
Tukwila, WA
Bid Date: Aug 21 2025
Tukwila, WA
Bid Date: Aug 14 2025
Tukwila, WA
Bid Date: Jul 22 2025
Tukwila, WA
Bid Date: Jan 09 2026
Tukwila, WA
Bid Date: Jun 12 2025
Tukwila, WA
--
Tukwila, WA
Bid Date: Apr 30 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
