BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 25, 2025 at 8:00 PM

Updated November 14, 2025

Site work for a communication facility in San Jose, California. Completed plans call for site work for a communication facility.

**As of October 8, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** For purposes of this Contract, Work consists of furnishing all labor, materials, tools, equipment, services, supervision, and incidentals necessary to install new signal equipment (Train-to-Wayside Communications loop, and signal house) at Champion Station's eastbound platform. New conduit and conductors will be installed, so blue-line and orange-line trains leaving the station will send an advance traffic call through City of San Jose's traffic controller as the trains head to the North 1st St/Tasman intersection. Question Submission Deadline : September 23, 2025, 2:00pm Please direct inquiries concerning the Contract Documents, bidding procedure and legal requirements to the designated Contract Administrator for this Project: Contract Administrator: Kimmy Truong Email: Kimmy.Truong@vta.org Bidders may also direct inquiries to the designated Contract Administrator via VTA eProcurement website System Description and Scope History Below are the existing lines and segments with the date they opened. Page 11 VTA currently operates an urban transit service with a fleet of diesel, both hybrid powered and electric powered buses, along with light rail vehicles and historic trolleys within Santa Clara County. The Santa Clara County service territory contains 1335 square miles and has a population of nearly 2 million. Rail service is provided from downtown Mountain View to south San Jose, through Sunnyvale, Santa Clara, Levi Stadium, and to many of the high technology campuses located within Santa Clara County. Bus service is provided in the residential areas of Palo Alto to Gilroy, Los Gatos to Milpitas and all cities in-between with some service routes extending up to the city of Fremont. The Engineer's Estimate for this Work ranges from $827,000.00 to $1,120,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Communication

$1,256,000.00

Public - County

Site Work

35

30

8

8

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
433
Active Projects
214
Bidding Soon
2,495
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2025

December 1, 2025

Project location map

W Tasman Dr & N First St, San Jose, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.