BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Renovation of a municipal facility in Laguna Beach, California. Completed plans call for the renovation of a municipal facility.

In general, the work comprises the complete replacement of the existing elevator equipment and controls to meet current performance and safety standards. In addition, a newly redesigned elevator cab will be installed, featuring upgraded finishes and energy-efficient lighting. Enhancements to the elevator lobby walls on both the first and second floors will be completed in accordance with the approved design. Minor mechanical and electrical modifications will also be incorporated to support the overall modernization effort, all within the City of Laguna Beach. Pre-Bid Meeting : No. Q&A Deadline : 08/25/2025 10:00 AM (PDT). Online Q&A - Yes. Prospective bidders must submit all questions for information and clarification of this Notice Inviting Bids to the City via Online before 10:00AM on Monday 08/25/2025. All questions and requests for information and clarification received before the stated time and date will be addressed by the City through Online by Thursday August 28, 2025. Bid Bond : 10.00% Payment Bond : 100.00% Performance Bond : 100.00% Liquidated Damages : $1,500 per working day Estimated Bid Value : $250,000 Start/Delivery Date : September of 2025 Project Duration : 30 days, excluding holidays from the date specified in the Notice to Proceed. License Requirements : Class B, General Building Contractor License The work to be done generally consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents. The general items of work includes the complete replacement of existing elevator equipment and controls to meet current performance and safety standards. A newly redesigned elevator cab with upgraded finishes and energy-efficient lighting will be installed. Improvements to the elevator lobby walls on both the first and second floors will be made in accordance with the approved design. Minor mechanical and electrical modifications will also be completed to support the overall modernization. A. The work covered by this section consists of furnishing and installing all l, materials, equipment, fixtures and performing all labor and operations for complete and operable systems. B. Provide all new materials, unless noted otherwise, of the best quality, and in perfect condition, and materials of the same make and quality throughout the work and as hereinafter specified. Comply with the requirements of ASTM, NEMA, U.L., and NBFM for materials and equipment. C. The intent of these specifications is to establish a standard of quality of materials installed. Include materials as specified without exception in the Base Bid. Submit for approval any proposed substitution, complete descriptive, technical, and cost comparison data, and test reports. Do not furnish or install any substitute items without written approval at the time of contract signing. Reimburse the Owner for any additional engineering charges and for any changes in the work of other trades resulting from substitutions. List proposed substitutions on the Bid Form, stating the reasons for substitution. When requested by the Architect or Electrical Engineer, samples, electrically wired at 120V. with plug, or system demonstrations of both specified and proposed items will be submitted for inspection at the Electrical Engineer's office and at a time convenient to all concerned parties. D. Where a substitution alters the design or space requirements indicated on the plans, Contractor is responsible for all additional cost for Engineering to revise plans. E. Verifying Drawings and Job Conditions: 1. Examine all drawings and specifications in a manner to be fully familiar of all work required. 2. Visit the site and verify existing conditions. Where existing conditions differ from drawings, make adjustments and allowances for all necessary equipment to complete all parts of the drawings and specifications. F. Shop Drawings: 1. Submit drawings in one set accompanied by letter of transmittal listing the number and dates of the drawings submitted.

Award

Municipal

$149,200.00

Public - City

Renovation

7

20

2

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
722
Active Projects
305
Bidding Soon
3,524
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2025

September 1, 2025

Project location map

505 Forest Ave, Laguna Beach, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.