Published August 14, 2025 at 8:00 PM

Updated August 22, 2025

Demolition, site work and asbestos abatement for a residential development in Ottumwa, Iowa. Completed plans call for the demolition of a residential development; for site work for a residential development; and for asbestos abatement for a residential development.

Asbestos Removal, Demolition and Disposal for the Structure at 402 Lincoln Avenue,Ottumwa The property located 402 Lincoln Ave, Ottumwa, Iowa was inspected prior to scheduled demolition activities which may disturb asbestos containing building materials in accordance with NESHAPS (National Emission Standards for Hazardous Air Pollutants) regulations. Field sampling methods were based on (NESHAPS) National Emission Standards for Hazardous Air Pollutants) protocols. Representative samples of suspect building materials were taken from Homogeneous Areas (HA-defined as similar in age, appearance and function). The purpose of this inspection was to identify quantities and locations of asbestos containing building materials prior to demolition of the structures. Bulk samples of suspect asbestos containing materials (ACM) were analyzed by Polarized Light Microscopy (PLM) with dispersion staining, as described in 40 CFR Part 763 and NESHAPs. Each sample was analyzed for the six different types of fibrous asbestos forms, of which a percentage, by volume, is estimated and summarized. If further analysis and quantification is warranted, this analysis is performed by EPA 600/R-93/116 with 400 or 600 Point Count Procedure. Further analysis of samples may also be performed at the client's request using Transmission Electron Microscopy (TEM). Sample analysis was performed by Eurofins CEI. Eurofins is accredited by the National Institute for Standards and Technology for Polarized Light Microscopy analysis under their NVLAP (National Voluntary Lab Accreditation Program). Asbestos removal, demolition and disposal at the following property is to be completed within thirty (30) working days ofthe date on the "Notice to Proceed" The Contractor shall commence removal within such time and work continuously as to be completed by the date indicated in this contract. The Contractor shall forfeit $250.00 per working day required to complete the contract after the aforesaid completion date. Bid security deposit required. (See bid form). A 100% performance bond or irrevocable letter of credit stating the total cost of the project bid is required from the successful bidder on all removal projects. For additional information concerning this project, contact Jake Rusch, at 641-683-0650 or ruschj q Ottumwa,us.

Post-Bid

Residential Subdivision

$50,000.00

Public - City

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
0
Bidding Soon
570
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2025

September 22, 2025

Project location map

402 Lincoln Ave, Ottumwa, IA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.