BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2025 at 7:00 PM

Updated November 14, 2025

Demolition, site work and new construction of a municipal facility in Porterville, California. Completed plans call for the demolition of a municipal facility; for the construction of a municipal facility; and for site work for a municipal facility.

Remove & Replace Mechanical Rooms (Building 27 & 28) SFM Permit No. 24-S-0431-C-DR Department of Developmental Services Porterville, Tulare County, Ca Project Comprises Labor, Material and Services Necessary for: Demolition, Excavation, Temporary Fencing, Temporary Hot Water Heaters, Cast in Place Concrete, Metal Fabrications, Bar Gratings, Fire Stopping, Joint Sealants, Painting, High Performance Coatings, Valves, Hangers and Supports, Vibration and Seismic Controls, Plumbing Equipment and Pipe Insulation, Steam, Condensate, Water, Waste and Vent Piping, Meters and Gauges, Pumps, Steam Traps and Equipment, Low Voltage Electrical Conductors and Cabling, Electrical Raceway, Wiring, Cable, Panelboards, and Related Work. A Dgs Representative Will Meet Attendees in the Lobby and Escort All Parties to the Bid Opening Location. At the Public Bid Opening, All Bids Received Will Be Opened and Recorded Onto a Preliminary Bid Tabulation. Bidders Do Not Need to Attend the Bid Opening as the Preliminary Bid Tabulation Will Be Emailed to Participating Contractors Immediately After the Bid Opening. License Required to Bid the Project: B Successful Bidder Shall Furnish Payment and Performance Bonds, Each in the Amount of 100 Percent of the Contract Price. The States Requirements for Disabled Veteran Business Enterprise (Dvbe) Participation Will Be Presented Along With Other Contract Requirements. Bidders Are Required to Sign in Upon Arrival and Sign Out at the Conclusion of the Pre-bid Site Inspection. Attendance for the Entire Inspection is Required in Order for Bidders to Be Eligible to Submit a Bid. Security Clearance: Bidders' Attention is Directed to the Deadline to Contact Art Iwasa, Project Director, at (916) 376-1737 No Later Than 4:00 P.m, August 25, 2025; and Provide (1) Full Name, (2) Telephone Number, (3) Company Representing. Cameras and Recording Devices Will Not Be Allowed (Not Applicable for Virtual Pre-bid Inspections). See Section 01 35 55, Developmental Center Project Procedures, for Additional Requirements. Term of This Project is 308 Calendar Days.

Post-Bid

Municipal

$1,733,500.00

Public - State/Provincial

Demolition, New Construction, Site Work

44

14

13

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
43
Bidding Soon
552
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

December 12, 2025

Project location map

26501 Ave 140, Porterville, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.