Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 23, 2025 at 8:00 PM
Updated October 24, 2025
Site work and addition to a water / sewer project in Hill City, South Dakota. Working plans call for site work for a water / sewer project; and for the addition of a water / sewer project.
**As of October 23rd, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The City of Hill City, SD (Owner) is requesting Statements of Qualifications from Construction Manager at Risk (CMAR) organizations (Proposers) for the construction of the following Project, and for related pre-construction and procurement CMAR services: Hill City WWTF Improvements Project The CMAR Contract will include the following services and Work: o Expansion of a wastewater treatment plant to a rated capacity of 0.5 MGD; preconstruction services and procurement services seeking qualified construction subcontractors for specified Work packages, including construction of: o New preliminary treatment with screening and grit removal, o New sequencing batch reactor, o New Clarifloculator, o New fuzzy filter, o New UV bank, o New electrical building and equipment, o Repair and replacement of existing process and electrical equipment, o Site work and related appurtenances, and; o Selective demolition of existing equipment. Owner anticipates that the CMAR's Contract Price will be approximately $11 to $15 million. The CMAR Contract has an expected construction start date of May 2026 and duration for construction of 36 months. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. In accordance with South Dakota Rules, Payment and Performance Bonds will be required from the selected CMAR. Direct inquiries in writing via email to Engineer, Jayme Klecker, PE at Jayme.Klecker@ae2s.com and Zac Ranisate at Zac.Ranisate@ae2s.com Question Deadline 08/27/2025 Project number - DMI5079 Owner does not plan to conduct an Informational Conference or Site Visit with Proposers at this stage of the CMAR selection process. Owner may conduct an Informational Conference with short-listed Proposers at a future date.
Final Planning
Water / Sewer
$15,000,000.00
Public - City
Addition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2025
May 1, 2026
To Be Determined, Hill City, SD
Related To This Project
Hill City, SD
Bid Date: Sep 15 2025
Hill City, SD
Bid Date: Nov 20 2025
Hill City, SD
Bid Date: Nov 20 2025
Hill City, SD
Bid Date: Dec 26 2025
Hill City, SD
Bid Date: Jun 24 2021
Hill City, SD
--
Hill City, SD
Bid Date: Sep 04 2024
Hill City, SD
--
Hill City, SD
--
Hill City, SD
Bid Date: Jan 31 2024
Hill City, SD
Bid Date: Dec 13 2021
Hill City, SD
Bid Date: Apr 05 2023
Hill City, SD
--
Hill City, SD
Bid Date: Jun 09 2022
Hill City, SD
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
