Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 9, 2025 at 8:00 PM
Updated September 10, 2025
Site work for a water / sewer project in Deltona, Florida. Completed plans call for site work for a water / sewer project.
EMAIL QUESTIONS TO: E-Mail Address: kDuffy@deltonafl.gov Kate Duffy, CPPO, CPPB Purchasing Manager Phone: (386) 878-8570 Fax: (386) 878-8571 This project involves the rehabilitation of rotor components at the Deltona Lakes Water Reclamation Facility (WRF) to restore full operational performance. The primary goal is to improve dissolved oxygen levels and directional flow in the oxidation ditch, ensuring ongoing regulatory compliance and treatment process efficiency. . Scope of Services The Contractor shall furnish all labor, materials, equipment, and supervision required to perform the following tasks: o Rotor Cover & Support Rehabilitation: o Inspect and repair or replace damaged rotor covers. o Rehab existing supports for rotor covers to ensure structural integrity and longterm durability. o Bearing and Pillar Replacement: o Remove and replace rotor bearings. o Replace support pillars if deemed necessary upon inspection. o Rotor Shaft Rehabilitation: o Inspect and refurbish the rotor shaft to restore it to "like new" condition. o Perform machining, cleaning, or balancing as required. o Gearbox Rebuild: o Disassemble, clean, and rebuild the rotor drive gear box if deemed necessary o Replace worn or damaged internal components. o Reassemble and test to ensure reliable operation. o Purchase new drive motor for gearbox. Deliverables Restored rotor system, fully operational and tested. o Final inspection report documenting all repairs performed. o Maintenance recommendations (if any). o Warranty documentation on parts and labor. All Prospective Bidders/respondents Are Hereby Cautioned Not to Contact Any Member of the City of Deltona Staff or Officials Other Than the Specified Contact Person. The City of Deltona Reserves the Right to Accept or Reject Any or All Bids/proposals and to Make the Award to That Bidder/respondent, Who in the Opinion of the City Will Be in the Best Interest of and/or the Most Advantageous to the City. The City of Deltona Also Reserves the Right to Reject the Bid/proposal of Any Vendor Who Has Previously Failed in the Proper Performance of an Award or to Deliver on Time Contracts of a Similar Nature or Who, in the City's Opinion, is Not in a Position to Perform Properly Under This Award. The City of Deltona Reserves the Right to Inspect All Facilities of Bidders/respondents in Order to Make a Determination as to the Foregoing. The City of Deltona Reserves the Right to Waive Any Irregularities, Informalities, and Technicalities in Offers Received, and May, at Its Discretion, Request a Re-bid, or Abandon the Project/procurement in Its Entirety.
Award
Water / Sewer
$253,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2025
October 6, 2025
To Be Determined, Deltona, FL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
