BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2025 at 8:00 PM

Updated September 16, 2025

Site work and paving for a mixed-use development in Hugo, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Lincoln County will perform all removal of current asphalt and sidewalk. This project will only include the North parking lot facing 8th Street, and the sidewalk attached to the North side of the building. Concrete is to be reinforced with #4 rebar on two-foot centers. Contractor will also be responsible for the replacement of the existing drainage pan and to finish grading The work is to be completed prior to October 31, 2025. Lincoln County reserves the right to reject any and all bids

Award

Sidewalks / Parking Lot

$22,952.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
7
Bidding Soon
88
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2025

September 26, 2025

Project location map

8th St, Hugo, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.