Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 17, 2025 at 8:00 PM
Updated September 18, 2025
Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The general work requested is: Construction of 7" concrete alley pavement, variable thickness asphaltic Concrete pavement, 7" concrete driveway, concrete curb and gutter, variable Thickness concrete walk and/or concrete driveways, variable thickness crushed Stone base, permeable pavers, sealing pavement joints and cracks, stone bedding, Slurry backfill, concrete and other removals, sewer work, etc.; Located at the following Alleys Bounded By (ABB): ST212240108 West Congress Street, West Marion Street, North 75th Street, & North 76th Street ST212180109 East Brady Street, North Cass Street, East Kewaunee Street, & North Marshall Street ST212250101 West Auer Avenue, West Burleigh Street, North 88th Street, & North 89th Street ST21200101 West Atkinson Avenue, West Finn Place, North 10th Street, & North 11th Street ST212230107 South Honey Creek Drive, South Lorene Drive, South Melinda Street, & West Wanda Avenue ST212220119 West Cypress Street, West Fond Du Lac Avenue, West Monroe Street, West Wright Street, & North 24th Street Time for Completion: All work on this contract shall be completed by October 31, 2025. Liquidated Damages, per diem: $1000.00/Day The bidder's commitment for Resident Preference Program Participation on the project is 40% The bidder's commitment for Apprenticeship Program participation on this project is zero (0). Apprentice(s) from NA of the following trade(s) are to be employed The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusion's (OEI) website at online. If there are any questions regarding SBE firms, please contact the OEI office at 414-286-5553. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. For those bids being submitted through Bid Express and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov. THE EMAILED COPY OF THE BOND MUST BE RECEIVED BY NO LATER THAN 10:30 A.M. ON THE SAME DATE THAT THE BIDS ARE DUE FOR THAT SPECIFIC OFFICIAL NOTICE, or the bid will be considered non-responsive. The original bid bond document must then be submitted by the contractor to the Department of Public Works Contract Office in-person or by mail to 841 N Broadway, Rm. 506, Milwaukee, WI 53202, within 24 hours upon being notified that they are the apparent low bidder.
Award
Roads / Highways
$1,061,974.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2025
September 26, 2025
Multiple Locations, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Aug 29 2025
Milwaukee, WI
Bid Date: Aug 28 2025
Milwaukee, WI
Bid Date: Aug 28 2025
Milwaukee, WI
Bid Date: Sep 23 2025
Milwaukee, WI
Bid Date: Sep 10 2025
Milwaukee, WI
Bid Date: Sep 04 2025
Milwaukee, WI
Bid Date: Dec 10 2025
Milwaukee, WI
Bid Date: Sep 01 2025
Milwaukee, WI
Bid Date: Aug 27 2025
Milwaukee, WI
Bid Date: Aug 15 2025
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Aug 26 2025
Milwaukee, WI
Bid Date: Aug 15 2025
Milwaukee, WI
Bid Date: Aug 26 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
