BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2025 at 8:00 PM

Updated September 16, 2025

Site work and paving for a mixed-use development in Fort Wayne, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Bidder shall furnish all labor, insurance, equipment, materials and power for the complete performance of this project as follows: Improve the N-S concrete alley bound by West Branning Ave, Lexington Ave, Buell Dr and Fairfield Ave by replacing poor concrete alley, sidewalk, curb, approaches, castings, and restoration. work shall consist of the fabrication, assembly, and installation of guardrail, guardrail transitions, and guardrail end treatments, in accordance with these requirements, and as shown on the plans. This work may also consist of the extension of existing guardrail with new guardrail, the removal of existing guardrail, or adjusting the height of existing guardrail. work shall consist of removing, storing, and reinstalling existing guardrail end treatments. The City is requesting bids/quotations for elimination of sidewalk vertical separations throughout the city per the specifications below. The Contractor shall horizontally saw cut all sidewalk joint deflections (also known as vertical separations or trip hazards) over 0.25" high up to and including 2" high in designated work areas. This is in accordance with FWR Section 600 - Concrete The City's goal for qualified Emerging Business Enterprise (E.B.E), as subcontractors on this project is ten percent (10%) of the contract amount. Completion- The Work will be substantially complete on or before 12/12/2025 ; Final Completion - 12/19/2025. Question Deadline 08/22/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Greg McDirmit: (260) 427-2764 or greg.mcdirmit@cityoffortwayne.org . Questions received less than four days prior to the date for opening of Bids may not be answered. Bid(5%), Performance(100%), Payment(100%), Maintenance

Award

Roads / Highways

$84,003.00

Public - City

Paving, Site Work

8

27

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
5
Bidding Soon
680
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2025

September 29, 2025

Project location map

Multiple Locations, Fort Wayne, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.