BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2025 at 8:00 PM

Updated October 21, 2025

Site work for a road / highway in McMinnville, Oregon. Completed plans call for site work for a road / highway.

The work contemplated under this contract includes all labour, materials, transportation, equipment, permits, traffic control, and services for, and incidental to, the completion of all construction work in connection with the project described in the contract documents. The contractor shall perform all work necessary so that the project can be fully used for the intended use as set forth in the contract documents. Question Deadline 08/27/2025 at 5:00 PM PT Questions regarding interpretation of documents shall be addressed to: Contact: Chad Hudson, Purchasing Manager E-mail: cch@mc-power.com. MW&L Answers to Bidder Questions - September 2, 2025 The general scope of this project is to install one owner supplied direct embedded steel transmission pole structure. The pole structure has been ordered and received by mw&l; contractor will be responsible for transporting the pole structure from mw&l's yard at 855 ne marsh lane, mcminnville, oregon to the jobsite at 3900 nw hombre street, mcminnville, oregon. The pole structure is in four pieces (slip joint) and will be assembled and erected by contractor. The project site is near the southwest corner of 3900 nw hombre st, mcminnville, oregon. Structure 2 is a new steel pole to be set at the corner intersection of two transmission lines. The existing transmission line has been temporarily relocated to allow overhead access for the pole location. The contractor is to coordinate with mw&l to de-energize nearby transmission lines if required. The contractor will be responsible for any required site access preparation. Site access is 70 feet from a dirt road across farmland. If any equipment cannot traverse the site as-is, the contractor is responsible for temporary access and site restoration to existing condition. Access is weather dependent. The contractor will be responsible for drilling/auguring holes for steel pole structures as indicated in the included project drawings. The depth of the hole is approximately 47.5' and the base diameter of the pole is 67" (this is the dimension of the pole base, not diameter of the hole). Once the pole is levelled, aligned, and set in place, contractor shall back fill with controlled low strength materials (clsm) as specified on drawing tm-101s. All work shall be substantially completed November 30, 2025. Estimate of $100K - $125K. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$146,127.00

Public - City

Site Work

8

14

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
25
Bidding Soon
992
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2025

October 6, 2025

Project location map

Multiple Locations, McMinnville, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.