BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2025 at 8:00 PM

Updated August 27, 2025

Site work and paving for a mixed-use development in Sturgeon, Missouri. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Project Scope: The City of Sturgeon is requesting bids for the construction of a new entrance and access drive at Mount Horeb Cemetery. The work includes excavation, base preparation with drainage considerations, geotextile reinforcement, and rock surfacing. Project Location & Description: Mount Horeb Cemetery New Entrance Drive Length: Approximately 1,000 linear feet Width: Approximately 10 feet Total Area: 10,000 sq. ft. Scope of Work: o Excavate 6 inches of existing material o Install geogrid fabric to stabilize base o Construct a rock base and top surface with proper drainage Materials & Work Requirements: 1. Earthwork & Preparation: Excavate and remove 6 inches of existing soil along the full 1,000' x 10' footprint Excavated dirt will remain onsite at a designated location as directed by the City Shape subgrade to promote drainage and prepare for geogrid installation 2. Geogrid Installation: Install geogrid fabric over the entire 1,000 ft x 10 ft roadbed (10,000 sq. ft.) Geo grid is to prevent migration of rock into subgrade and provide structural reinforcement 3. Rock Base & Surface: Base Rock: o 150 tons of 2" - 3" rock for initial base layer Top Base Rock: o 150 tons of 1" clean rock for the top base and finished driving surface Additional Clean Rock for Drainage: o 1" clean rock x 300 (please confirm unit: tons or cubic feet) 4. Drainage: Contractor is responsible for ensuring proper drainage is incorporated (e.g., crowned roadbed, side ditches, or culverts as needed) to prevent erosion and ponding Contractor Requirements: Contractor must be fully licensed and insured to perform work in the State of Missouri and in compliance with all applicable local, state, and federal regulations. Bid Deliverables: Lump sum bid for the entire project Breakdown of materials, labor, and equipment costs Proposed construction schedule Warranty and quality assurance details References for similar roadway or cemetery access projects Project Completion Deadline: on or before November 11, 2025 The City reserves the right to reject any or all bids and award the project in the best interest of the City

Bid Results

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
468
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2025

September 24, 2025

Project location map

1852 Sturgeon Cemetery Rd, Sturgeon, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.