Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 11, 2025 at 8:00 PM
Updated October 18, 2025
Site work and paving for a mixed-use development in Parker, Colorado. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Reference Number 0000395557 The project consists of constructing a 10-foot-wide concrete shared use path along the east side of Parker Road between Pine Drive and Stroh Road in two different segments. Curb ramps will be upgraded to be ADA compliant when within the work area. Retaining walls, two prefabricated steel pedestrian bridges, and other drainage structures will be required in various locations. Question Deadline 08/28/2025 at 9:00 AM MT Questions are submitted online No, All bidders questions and inquires shall be directed to the Town of Parker's Project Manager, Tom Gill at tgill@parkerco.gov. D Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Pre-Qualification of Bidder: The contractor must be on CDOT's contractor pre-qualified list prior to submitting a bid and must provide proof of the prequalification with the Contractor's bid. online. All bids must be accompanied by a Bid Bond in an amount of at least five percent (5%) of the Bid. The vendors can upload their bid bond when responding online. The bond will be retained by the Town as liquidated damages if the successful bidder refuses or fails to enter into a Contract and Performance and Payment bond in accordance with his bid when notified of the award. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The extent of the work is approximately as follows: The project consists of constructing approximately 3,700 feet of a 10-foot-wide concrete shared use path along the east side of Parker Road (State Highway 83) between Pine Drive and Stroh Road in two different segments. Curb ramps will be upgraded to be ADA compliant when within the work area. Retaining walls, two prefabricated steel pedestrian bridges, and other drainage structures will be required in various locations. Each bid shall be made on the Form of Bid provided in the Contract Documents, and no Bidder may withdraw his/her bid for a period of ninety (90) calendar days from the Notice to Proceed (NTP). Contract shall be completed on or before November 20, 2026, for this project. Liquidated damages will be charged in accordance with Trade Contractor's Agreement, Article 4. The Owner reserves the right to waive irregularities, to waive technical defects accordingly as the best interest of the Town may be served, may reject any and all bids, and shall award the contract to the lowest, responsive, responsible bidder as determined by the Owner. Bid Open Desc - Join Zoom Meeting https://parkeronline-org.zoom.us/j/81314310344pwd=go7DztRsnlGlbT3LwRA9YwdNf2O5Hb.1 Meeting ID: 813 1431 0344 Passcode: 966942 --- One tap mobile +17193594580,,81314310344# US +12532158782,,81314310344# US (Tacoma) Join instructions https://parkeronline-org.zoom.us/meetings/81314310344/invitations signature=erfgSZKJlOCHwKx83vlfhcCslNYN6GLo0i62Tk6ZB78
Bid Results
Sidewalks / Parking Lot
$3,721,033.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2025
November 20, 2025
Parker Rd, Parker, CO
Related To This Project
Parker, CO
Bid Date: Oct 13 2025
Parker, CO
Bid Date: Dec 03 2025
Parker, CO
Bid Date: Dec 12 2025
Parker, CO
Bid Date: Dec 11 2025
Parker, CO
Bid Date: Dec 18 2025
Parker, CO
Bid Date: Jan 27 2026
Parker, CO
Bid Date: Sep 05 2025
Parker, CO
--
Parker, CO
Bid Date: Aug 21 2025
Parker, CO
Bid Date: Aug 29 2025
Parker, CO
Bid Date: Aug 12 2025
Parker, CO
Bid Date: Aug 15 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
