BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 15, 2025 at 8:00 PM

Updated October 16, 2025

Site work for a civil project in Parker, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000398720 In 2022, PWSD completed the Cherry Creek Interceptor (CCI) pipeline project, which diverts a portion of flows from the District's South Water Reclamation Facility (SWRF) and allows flows from three (3) lift stations to be conveyed by gravity to the North Water Reclamation Facility (NWRF). This pipeline eliminated the need for the lift stations, which have since been taken offline and cleaned, and some equipment salvaged by District staff. The Contractor shall be responsible for assisting with salvage of additional equipment, installing plugs in discharge pipelines, demolition and hauling of remaining infrastructure, and restoration and revegetation of property to match surrounding conditions. The Contractor will also be responsible for demolition of several manholes that were bypassed when CCI was put into service. Question Deadline 09/25/2025 at 5:00 PM MT Questions are submitted online No, Emilie Abbott will serve as the District's Project Manager (PM) and will administer the contract with the selected Contractor. Questions during the procurement period should be directed by email to: Emilie Abbott, P.E., Senior Project Manager Email: eabbott@pwsd.org October 24, 2025 - Notice to proceed PWSD reserves the right to reject any or all bid packages, including without limitation the right to reject any or all nonconforming, nonresponsive, unbalanced or conditional bid packages and to reject the bid of any Contractor if PWSD believes that it would not be in the best interest of PWSD to make an award to that Contractor. Upon receipt of a written Notice to Proceed from PWSD, the Contractor shall schedule and conduct a kickoff meeting. Subcontractors should be included at the discretion of the Contractor. At the kickoff meeting, the Contractor shall be prepared to review the scope of the project and initial project schedule.

Post-Bid

Water / Sewer

$700,000.00

Public - City

Site Work

18

7

11

6

Subscribe For Documents

70 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
63
Bidding Soon
1,157
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2025

October 24, 2025

Project location map

Multiple Locations, Parker, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.