Renovation of a civil project in Marietta, Ohio. Completed plans call for the renovation of a water / sewer project.

As of November 13, 2025, project has been awarded. The projected start date will be 30 days from November 14, 2025 and is scheduled to end in December of 2026. Include: Name / address of Company, direct email to receive addenda / plans / specs, type of bidder/contractor (i.e. General, Electrical, vendor, etc.). Plan holder's list will be maintained by PCWC. Only bidders who have requested a set of documents may submit a bid on the project and will be the only entities that will receive addenda. Each bidder is required to furnish with its proposal, a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. This project is a prevailing wage project requiring use of Davis Bacon prevailing wages. No bidder shall be permitted to withdraw his bid for a period of sixty (60) days after the time of opening bids. Should any bid be rejected, the accompanying bid bond, or check, will be returned to the bidder forthwith and should any bid be accepted, the check, or bid bond will be returned upon the proper execution and securing of the contract. The right is reserved, by the Putnam Community Water Corp to reject any or all bids. ENGINEER'S COST ESTIMATE: $ 370000 QA date - 9 - 11 - 2025 Should any Bidder find discrepancies, inconsistencies, ambiguities, errors, or obvious omissions in the Documents, or is in doubt as to meaning, these questions should be addressed to Owner (jhuck76@putnamwater.com) who, if deemed appropriate will then send written instructions to all Bidders. Such notification must be received no later than 7 days before the Bid date. Description of Project: Project consists of two (2) 48-inch PFAS contactor vessels with all piping / accessories / valves for a complete system of one (1) train of lead-lag operation. Cartridge filter to be installed in front of PFAS contactors. Project located in the inside of an existing building on the second floor. Opening in the slab is as shown and hook height of existing hoist shown at 81 inches above second floor

Award

Water / Sewer

$369,500.00

Public - County

Renovation

7

13

2

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
54
Bidding Soon
1,087
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2025

December 15, 2025

Project location map

920 River Rd, Marietta, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.