BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2025 at 8:00 PM

Updated September 27, 2025

Site work and paving for a mixed-use development in Hartford, Michigan. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of September 26, 2025 this project has started design. The timeline is for this to go out for bid in early 2026, with a start date in Spring of 2026. Per the engineer documents should be available February/March 2026 Project Scope: The project for which funds will be requested consists of roadway reconstruction and water main replacement on W. Main Street from the west City limits to Center Street, including approximately 200' of each approach. The existing water main will be replaced with a new 12" ductile iron water main from Marion Street to Center Street, including approximately 200' of each approach. As part of the project, the new water main will be installed beneath the CSX railroad. Water services will be replaced within the public right-of-way and any lead water services encountered will be replaced into the building. The roadway will be fully reconstructed throughout the project limits. Some storm sewer will be replaced or added and minor sanitary sewer improvements may be needed. No new easements are anticipated. The project is located along a commercial corridor in the central part of the City. There are no known environmental concerns (eg. bodies of water, wetlands, historic sites, critical dunes, contamination), although permits will be required from EGLE for water main construction. A location map is attached. Project Description: The project includes approximately 0.5 miles of improvements to W. Main Street from the west City Limits to Center Street, plus approximately 200' of each approach at Center Street. The existing cast iron water main will be replaced with a 12" water main from Marion Avenue to Center Street, including approximately 200' of each approach at Center Street. As part of the water main replacement, a new water main will be installed beneath the CSX railroad. Additionally, lead service lines will be replaced for the entire length of the project. The roadway will be reconstructed with a new aggregate base, hot mix asphalt (HMA) surfacing, new drainage structure covers, ADA ramp improvements, curb and gutter replacement as necessary, permanent signs, pavement markings, and slope restoration.

Design

Roads / Highways

$2,300,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
99
Bidding Soon
1,528
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2025

May 11, 2026

Project location map

Multiple Locations, Hartford, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.