Published November 6, 2025 at 7:00 PM

Updated November 7, 2025

Demolition, site work and new construction of a mixed-use development in Kings Park, New York. Completed plans call for the demolition of a parking garage; for the construction of a parking garage; for site work for a parking garage; service station / car wash facility; service station / car wash facility; and service station / car wash facility.

New Bus Garage and Transportation Facility - Contract - M1. SUMMARY OF CONTRACT M WORK A. Furnish all labor, equipment, materials, tools, means, methods, and incidentals necessary to complete the Work as required by the Contract Documents for this Construction Contract. Each contractor shall coordinate, through the Owner/Architect/Engineer, the work of their contract with the work by others. B. This following abbreviated summary is provided in order to briefly describe the work covered by the Contract Documents for this Construction Contract. It is not all inclusive of the work under the Contract. C. The work includes, but is not limited to, the following: 1. Startup participation for the various equipment and systems of the project and provide complete service to troubleshoot and assist manufacturer service representatives in obtaining a completely functional installation. 2. New gas-fired infrared heaters for the garage. 3. New exhaust fans, supports, and associated equipment. a. Toilets, locker rooms, and custodian closets. b. Air handling unit economizer. c. Garage summer ventilation. d. Vehicle exhaust systems. e. Pit ventilation system. 4. Gas detection systems for CO and NO2 gases in the garage. 5. New diffusers, grilles, registers, duct work, supports and accessories. 6. Furnish louvers and coordinate location for Contract G to install. 7. New air conditioning system. a. Variable-air-volume (VAV) indoor air handling unit for administration and general areas. b. DX cooling coil with remote air-cooled condensing units. c. Integral gas-fired furnace for heating. d. Remote VAV boxes. 8. New energy recovery heating and ventilating unit for the garage. a. Fixed plate type energy recovery. b. Supply and exhaust fans. c. Integral gas-fired furnace for heating. 9. New electric wall heaters at entrances/exits. 10. Testing, adjusting, and balancing of systems. 11. New automatic temperature control systems. 12. Project closeout submittals. New Bus Garage and Transportation Facility including Site Improvements and New EV Charging Station and Existing Bus Garage Building Demolition. NEW BUS GARAGE AND TRANSPORTATION FACILITY SED CONTROL #: 58-08-05-06-5-015-001 Contract C1 - Civil/ Site Work Contract P1 - Plumbing Work Contract G1 - General Construction Work Contract E1 - Electrical Work Contract M1 - HVAC Work NEW EV CHARGING STATION SED CONTROL #: 58-08-05-06-5-015-002 Contract C2 - Civil/ Site Work Contract E2 - Electrical Work EXISTING BUS GARAGE DEMOLITION SED CONTROL #: 58-08-05-06-5-003-012 Contract D - Demolition Work Project No: KPSD2401, GJ2422654.Y00 Doc.Note- Checks or money orders shall be made payable to Kings Park Central School District. Plan deposit is refundable in accordance with the terms in the Instructions to Bidders to all submitting bids. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Please note REVplans (melville.h2mplanroom.com) is the designated location and means for distributing and obtaining all bid package information. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record. The Provider takes no responsibility for the completeness of Contract Documents obtained from other sources. Contract Documents obtained from other sources may not be accurate or may not contain addenda that may have been issued. Commence Construction: 11/1/2025 All Work Substantially Complete: 12/12/2026 Final Punch List / Closeout: 1/12/27 Question Deadline 10/23/2025 questions shall be submitted in writing to: H2M architects + engineers Craig Schmohl, R.A. - Senior Project Architect 538 Broad Hollow Road, 4th Floor East, Melville, New York 11747 Phone: (631) 756-8000 Ext. 1237 E-mail: cschmohl@h2m.com To be given consideration, questions must be received at least five (5) days prior to the date fixed for the opening of bids

Post-Bid

Parking Garage

$844,000.00

Public - City

Demolition, New Construction, Site Work

142

48

4

3

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
847
Active Projects
413
Bidding Soon
6,737
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2025

November 23, 2025

Project location map

38 Lawrence Rd, Kings Park, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.