BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 16, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a mixed-use development in Crestview, Florida. Design plans call for site work for a road / highway; and for paving for a sidewalk / parking lot.

Officials in Okaloosa County, Florida, have approved a $10 million local contribution toward widening State Road 85 from Live Oak Church Road to P.J. Adams Parkway. The 1-mile project carries an estimated construction cost of $36.2 million and is included in the Florida Department of Transportation’s tentative 2028 work plan. Work remains in the planning and right-of-way acquisition phase ahead of construction. County public works officials anticipate widening this section of SR 85 is critical to ensuring the $200 million Southwest Crestview Bypass and Interstate 10 interchange projects deliver their full traffic benefits. The bypass, a major regional transportation project now underway, is expected to restructure how drivers move through south Crestview. Officials caution, however, that the new route will work as intended only if SR 85 is widened to handle the added demand. State Road 85 serves as Okaloosa County’s primary north-south corridor, carrying daily commuters, military traffic, and seasonal visitors traveling between Interstate 10 and the Emerald Coast. In preparation for the project, the county has already purchased one of the stormwater management sites and is negotiating a second one that can be donated to FDOT. The agency’s 2028 work program begins July 1, 2027, but officials expect construction to begin around 2028, pending right-of-way acquisitions. ----------------------------------------------------------- As of September 12, 2025, an engineer has been selected and this project is in the design phase. This project is currently unfunded for remaining of design, right of way, and construction. Construction could be 10 years away. This multi-lane reconstruction project consists of widening SR 85 (South Ferdon Boulevard) from four (4) lanes to six (6) lanes from north of PJ Adams Parkway to Mirage Avenue and shall include reconstruction of SR 85 and reconfiguration of the I-10 interchange as a U-Turn Interchange. The overall anticipated project length is 1.06 miles. The proposed typical section as recommended in the PD&E Study (FPID 220171-2) is an urban 6-lane typical section with a 30’ median, 6’ sidewalk along the eastern right-of-way, and 10’ multiuse path along the western right-of-way.

Design

Roads / Highways

$73,200,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
60
Bidding Soon
823
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2035

Project location map

FL-85, Crestview, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.