BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 10, 2025 at 8:00 PM

Updated October 11, 2025

Site work for a water / sewer project in Miramar, Florida. Completed plans call for site work for a water / sewer project.

As per addendum 2, bid date extended to October 9, 2025, at 2:00 P.M. from 9/18/2025 at 2:00 P.M. The scope of work includes but is not limited to all labor, material, tools, equipment, and incidentals, as necessary for the installation of a NEW STANDBY DIESEL GENERATOR & Auto Transfer Switch for lift station 54. The City reserves the right to reject any or all bids/proposals, to waive any informality in a bid/proposal and/or in the bidding/selection process, and to make awards, if awarded, to the lowest responsive, responsible bidder/offeror as deemed in the best interest of the City. Question Deadline 09/04/2025 All questions must be submitted in writing to the City's Procurement Department, 2200 Civic Center Place, Miramar, Florida 33025, by email to: bamartin@miramarfl.gov, no later than September 4, 2025. Absolutely no questions will be answered if submitted after the question submittal deadline. Webex instructions are as follows: Meeting Information: Meeting link: https://miramarfl.webex.com/miramarfl/j.phpMTID=m073fbf372169846c5c2f8fda0d9813b4 Meeting number: 2317 365 2169 Password: vfSuDRvp266 Host key: 681657 Join by video system: Dial 23173652169@miramarfl.webex.com You can also dial: 173.243.2.68 and enter your meeting number Join by phone: +1-415-655-0001 US Toll Access code: 2317 365 2169 Host PIN: 5487 The scope of work includes but is not limited to all labor, material, tools, equipment, and incidentals, as necessary for the installation of a NEW STANDBY DIESEL GENERATOR & Auto Transfer Switch for lift station 54. The work includes but not limited to: prepare drawings for permitting, permit through building department, pour new concrete slabs, set & secure new ATS NEMA 3R, trench from generator pad to new ATS, re-route electric from existing main ATS-loads, set &secure new generator with base tank on new pad, extend fence as needed at each site, pull cable from GEN-ATS & ATS-Existing pump controllers, terminate cable, install new emergency stop, start-up & test, and demobilize. The Project is located on 2800 Southwest 136 th Avenue, Miramar, Florida, 33027. The commencement date shall be established in the Notice to Proceed. Contractor shall commence the Work within 10 Days from the commencement date. The Work shall be Substantially Complete within 180 Calendar Days after the commencement date given in the Notice to Proceed. The Work shall be Finally Completed for full acceptance by the City within 210 Calendar Days after the commencement date given in the Notice to Proceed.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
111
Bidding Soon
1,714
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2025

October 20, 2025

Project location map

2800 SW 136th Ave, Miramar, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.