Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published November 18, 2025 at 7:00 PM
Updated November 19, 2025
Site work and paving for a civil project in Miramar, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Counties: Broward, Miami-Dade Road Name: Tpk Ext (Sr821) Thru Lane Implementation (Mp 27-40.2 Limits: 87471000 Project(s): 44388235201(*) Federal Aid No: N/A Project(s): 44388245201 Federal Aid No: N/A Total Roadway Length: 32.797 Miles Contract Days: 296 Total Bridge Length: 0.000 Miles Total Proposal Length: 32.797 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Work consists of providing all labor, materials, equipment and incidentals necessary for implementation of thru lanes along the Turnpike Extension (SR 821) from mile post 27 (SR 836 / SR 821 Interchange) to mile post 40.2 (Broward County Line) and from mile post 40.2 (Broward County Line) to mile post 47 (Turnpike). The project is divided into two separate FPID numbers at the Miami-Dade / Broward County Line. The improvements include milling and resurfacing, establishing ingress/egress locations, establishing the double solid white striping thru lane buffer, and installing thru lane sign panels on existing sign structures. ITS is required for the Toll Amount Dynamic Message Signs (TADMS) needed to sign motorists to the I-75 Express Lanes. No Pre-Bid Conference. Contractor must be prequalified. Question Deadline 10/14/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online, for questions posted after this deadline, an answer cannot be assured. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 005 - Hot Plant-Mixed Bituminous Course/Pavement Marking - SR 821
Award
Roads / Highways
$3,853,385.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2025
December 22, 2025
FL-821, Miramar, FL
Related To This Project
Miramar, FL
Bid Date: Jan 29 2026
Miramar, FL
Bid Date: Oct 16 2025
Miramar, FL
Bid Date: Oct 29 2025
Miramar, FL
Bid Date: Oct 30 2025
Miramar, FL
Bid Date: Oct 30 2025
Miramar, FL
Bid Date: Oct 31 2025
Miramar, FL
Bid Date: Nov 11 2025
Miramar, FL
Bid Date: Sep 11 2025
Miramar, FL
Bid Date: Oct 09 2025
Miramar, FL
Bid Date: Oct 09 2025
Miramar, FL
Bid Date: Oct 09 2025
Miramar, FL
Bid Date: Oct 09 2025
Miramar, FL
Bid Date: Oct 09 2025
Miramar, FL
Bid Date: Oct 14 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
