Site work for a water / sewer project in Kingsville, Texas. Completed plans call for site work for a water / sewer project.

GLO SW Project 1(E. Santa Gertrudis St.) Storm Water Improvements. Bids are invited for several items and quantities of work as follows: 1 Mobilization / Bonds / Insurance Traffic Control Utility Adjustment SWPP (Sediment Control Fence) SWPP (Erosion Control Log) Remove Street Asphalt Mill Street Asphalt Remove Exist. Curb & Gutter Remove Exist. Curb Remove Exist. Sidewalk Remove Exist. ADA Sidewalk Ramp Remove Exist. Valley Gutter Remove Exist. 18" 0 RCP Remove Exist. 24" 0 RCP Remove Exist. Curb Inlet Remove Exist. Outfall Structure Remove Exist. 36"0 RCP Repair Street Asphalt Overlay Street Asphalt Repair Curb & Gutter Repair Curb Repair Sidewalk Repair ADA Sidewalk Ramp Repair Valley Gutter Repair Exist. 24" 0 RCP 18" 0 RCP Class V 24" 0 RCP Class V 36" 0 RCP Class V Concrete Collar Junction Box Type 'A' Outfall Structure Plug and Abandon Existing 36"0 RCP 4'x3'RCB Refl Pav Mark TY 1 (W) 4" (SLD) Refl Pav Mark TY 1 (Y) 4" (SLD) Refl Pav Mark TY 2 (A-A) A bid bond in the amount of 5 percent of the bid issued by an acceptable surety shall be submitted with each bid [for those contracts that exceed $100,000]. A certified check or bank draft payable to the City of Kingsville or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond. All contractors and subcontractors must be cleared (not suspended or debarred) prior to any formal action authorizing the award of a contract to the contractor. Minority Business Enterprises, Small Business Enterprises, Women Business Enterprises, veteran-owned businesses, and labor surplus area firms are encouraged to submit bids. The City of Kingsville reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by City of Kingsville for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder's qualifications prior to the contract award. Q/A:- No oral interpretations will be made to any bidder. Each request for clarification shall be made in writing to the City/County or engineer no less than seven (7) days prior to the bid opening. Each interpretation made will be in the form of an Addendum to the contract documents and will be distributed to all parties holding contract documents no less than seven (7) days prior to the bid opening. It is, however, the bidder's responsibility to make inquiry as to any addenda issued. All such addenda shall become part of the contract documents and all bidders shall be bound by such addenda, whether or not received by the bidders. MBE (44.2%), WBE (6.9%) Completion-160 calendar days

Post-Bid

Water / Sewer

$660,706.00

Public - City

Site Work

41

11

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
17
Bidding Soon
314
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2025

October 9, 2025

Project location map

E Santa Gertrudis St, Kingsville, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.