Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 2, 2025 at 8:00 PM
Updated October 3, 2025
Site work for a water / sewer project in Hastings, Minnesota. Working plans call for site work for a water / sewer project.
Bid is cancelled. The U.S. Army Corps of Engineers - St. Paul District requires a contractor to provide all equipment, materials, and labor for the installation and testing of a new fire alarm system at the Lock House at Lock & Dam #2, which currently lacks such a system. The new system shall include, but is not limited to, a Fire Alarm and Mass Notification Control Unit (FMCU); smoke, heat, and carbon monoxide detectors; pull stations; audible/visual notification appliances; and primary and auxiliary power supplies. Upon completion, the contractor must demonstrate full operability of all system functions in the presence of Lock 2 maintenance staff and the Contracting Officer's Representative, and provide training to the maintenance staff on system operation and maintenance. Location: Lock & Dam No. 2, 1350 Lock and Dam Road, Hastings, MN 55033. The estimated magnitude of construction is between $25,000 and $100,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 09/09/2025 Any questions concerning this RFQ shall be transmitted via email to John.P.Riederer@usace.army.mil at least two days prior to solicitation close, to allow adequate response time. The contractor shall provide all equipment, materials, and labor associated with the installation and testing of a new addressable fire alarm system. The new system shall include but is not limited to a Fire Alarm and Mass Notification Control Unit (FMCU); smoke, heat, and carbon monoxide detectors; pull stations; audible/visual notification appliances; and primary and auxiliary power supplies. All work shall be conducted, and components shall be designed in accordance with the requirements listed in the attached specifications. After installation, the contractor shall demonstrate the operability of all functions in the presence of the Lock 2 maintenance staff and Contracting Officer Representative (COR) and provide instruction to Lock 2 maintenance staff on the operation and maintenance of the system and features.
Final Planning
Water / Sewer
$100,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 29, 2025
October 29, 2025
To Be Determined, Hastings, MN
Related To This Project
Hastings, MN
Bid Date: Sep 11 2025
Hastings, MN
Bid Date: Nov 05 2025
Hastings, MN
--
Hastings, MN
--
Hastings, MN
Bid Date: Jan 06 2026
Hastings, MN
Bid Date: Feb 12 2026
Hastings, MN
Bid Date: Mar 19 2026
Hastings, MN
Bid Date: Sep 04 2025
Hastings, MN
Bid Date: Sep 02 2025
Hastings, MN
Bid Date: Aug 22 2025
Hastings, MN
Bid Date: Sep 12 2025
Hastings, MN
Bid Date: Sep 30 2025
Hastings, MN
Bid Date: Aug 08 2025
Hastings, MN
Bid Date: Sep 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
