Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 25, 2025 at 8:00 PM
Updated August 26, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Lexington, Virginia. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
This project aims to replace an aging bridge over Woods Creek on Lime Kiln Road in the City of Lexington, between Catalpa Place and McLaughlin Street. The existing superstructure will be replaced, and the bridge will be widened to the upstream side without adding vehicular capacity. The superstructure includes the bridge deck, railings, and other components on the piers and abutments. During construction, the road will be closed to vehicular traffic, and a detour will be placed. However, the bridge will be constructed in stages for uninterrupted pedestrian traffic. The intent is to minimize the impact on Lime Kiln Bridge Park, Chessie Nature Trail, and Woods Creek Trail. Project management, and Construction Contract are to be Administered by VDOT under the State of Good Repair Program Benefits. U000-117-178 UPC 112964 This project is included in the city's 2026-2030 Capital Improvement Program (CIP) and being managed by VDOT. As of August 25, 2025, project is in design. Estimated start date for construction Summer 2026. Completion date to be determined. Design approval: Fall 2025. Right of way/utility relocation: Fall 2025-summer 2026. Advertise for construction: Summer 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Bridges / Tunnels
$2,407,153.00
Public - City
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2026
Lime Kiln Rd, Lexington, VA
Related To This Project
Lexington, VA
Bid Date: Feb 15 2026
Lexington, VA
Bid Date: Sep 08 2025
Lexington, VA
Bid Date: Sep 23 2025
Lexington, VA
Bid Date: Nov 03 2025
Lexington, VA
Bid Date: Jan 14 2026
Lexington, VA
--
Lexington, VA
--
Lexington, VA
Bid Date: Aug 19 2025
Lexington, VA
Bid Date: Aug 27 2025
Lexington, VA
Bid Date: Jul 09 2025
Lexington, VA
Bid Date: Jul 10 2025
Lexington, VA
Bid Date: Jul 15 2025
Lexington, VA
Bid Date: Sep 26 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
