Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 19, 2025 at 8:00 PM
Updated September 20, 2025
Renovation of a fire / police facility in Hagerstown, Maryland. Completed plans call for the renovation of a fire / police facility.
Brief Project Summary: Exterior building refurbishment including but not limited to: soda blasting, primer, paint, cmu joint repair, cmu crack repair, cmu window lintel replacement, sheet metal panels along with all appurtenances to complete this project. Completion within 30 days of date in Notice to Proceed. Question Deadline 09/11/2025 at 4:00 PM ET If you have questions, please direct them to Bill Killinger, Asst. Director of Engineering wkillingci@hagcrstownmd.org, or 301-739-8577 Ext 129 Contact Bill Killinger: wkillinger@hagerstownmd.org or 1-301-739-8577, ext 129 before 09/11/2025 @ 4:00PM with questions. Scope of Work: Refer to the attached photographs. All attachments are considered a part of the contract. 1. Base Bid (west side): The contractor shall furnish and install all items shown and noted on the photographs along with all appurtenances to complete this project. Scope of work description below, _ Soda blasting is required on the exterior surface of the west side (entrance area) as shown on the photographs that denote the work limits. _ Al' soda blasted surfaces will require McCormick Paint Pertnalok 100% Acrylic Masonry Primer #06451. Two (2) primer coats shall be applied. _ All primed surfaces will require McCormick Paint Permalok High Performance Waterproofing Coating #01324 (color: Floor Trek Light Gray "match"). Two (2) finish coats shall be applied. _ All exterior surface finish coats will be painted in one (1) color: Floor Trek Light Gray. _ Remove and replace two (2) double window headers (CMU lintel), wall is 12"+/~ thick. Assume exterior lintel replacement, if interior lintel needs replaced the Parks Dept, will provide access io interior of PAL. building. Minor interior repairs might be required if interior lintel is replaced. Any repairs completed on the interior shall match existing interior conditions. _ Furnish and install 26-gauge galvalume metal panels and all related trims, color Forest Green along with all related appurtenances as shown. Furnish & install metal flashing above entryway (color Forest Green). Complete CMU joint/crack repair, limits of repair to be determined after soda blasting is completed, The Parks Department will remove all building mounted signs, mailbox and bulletin board prior to construction and re-install after construction is completed. The existing overhead light in the entrance will need removed prior to soda blasting and re-installed after priming and painting are complete. Perform site cleanup, return all disturbed areas to original condition or better.
Bid Results
Fire / Police
$21,531.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 17, 2025
October 17, 2025
520 N Cannon Ave, Hagerstown, MD
Related To This Project
Hagerstown, MD
Bid Date: Aug 28 2025
Hagerstown, MD
Bid Date: Sep 24 2025
Hagerstown, MD
Bid Date: Oct 01 2025
Hagerstown, MD
Bid Date: Sep 29 2025
Hagerstown, MD
Bid Date: Sep 23 2025
Hagerstown, MD
Bid Date: Oct 08 2025
Hagerstown, MD
Bid Date: Oct 15 2025
Hagerstown, MD
Bid Date: Oct 14 2025
Hagerstown, MD
Bid Date: Sep 29 2025
Hagerstown, MD
Bid Date: Sep 10 2025
Hagerstown, MD
--
Hagerstown, MD
--
Hagerstown, MD
Bid Date: Aug 20 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
