BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Site work and outdoor lighting for a residential development in Westfield, Massachusetts. Completed plans call for site work for a residential development; and for outdoor lighting for a residential development.

Replacement of exterior pole-mounted site lighting fixtures. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. All bidding Requests for Information (RFIs) shall be submitted online by 09/09/2025 at 10:00AM EDT for general bids. The Schedule of Values shall contain a separate item for each Section of the Specifications broken down in such form as the Prime Designer may require. Each item in the Schedule of Values shall include its proper share of overhead and profit. .1 The Schedule of Values shall be arranged in vertical columns identified with titles, including Line-Item Number, Description of Work, Scheduled Value, Work Completed (From Previous Application and This Period), Materials Presently Stored, Total Completed and Stored to Date, Percentage, Balance to Finish and Retainage (5%). The Schedule of Values shall be updated showing the status of work covered by approved Change Orders. The Schedule of Values may be revised if later found by the Prime Designer to be inaccurate. .2 For each line item which has installed value of more than $20,000, breakdown the costs to list major products, components, labor, or operations under each line. .3 The sum of costs of all items listed in the Schedule of Values shall be equal to the total Contract Sum. .4 Work Covered in Division 1: Itemize separate line-item cost for each of the following general cost items (if applicable): a. Insurance. b. Performance and Payment Bonds. c. Supervision and Project Management. d. Submittals Preparation. e. Protection. f. Temporary facilities. g. Project sign.

Award

Residential Subdivision

$101,500.00

Public - City

Outdoor Lighting, Site Work

6

13

14

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
572
Active Projects
246
Bidding Soon
3,830
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2025

October 20, 2025

Project location map

108 Kasper Dr, Westfield, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.