Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 1, 2025 at 8:00 PM
Updated October 2, 2025
Site work and paving for a mixed-use development in Independence, Wisconsin. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
**As of October 1, 2025, bids received were rejected as they were over the budget. Project will be rebid but no definite date yet.** Major quantities for the Work include: Mobilization LUMP SUM 1 Traffic Control LUMP SUM 1 Remove Existing Pavement SQ YD 791 Sawing Bituminous Pavement (Full Depth) LIN FT 114 Common Excavation (P) CU YD 319 Subgrade Preparation SQ YD 888 Concrete Sidewalk, 6-Inch SQ FT 226 Crushed Aggregate Base Course, 8-Inch CU YD 198 30-Inch Concrete Curb & Gutter, Remove and Replace LIN FT 28 HMA Asphalt Pavement, 4 MT 58-34 S TON 193 Bituminous Material for Tack Coat GAL 89 Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The City of Independence reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the City. For this project, bids will ONLY be received electronically. Contractors submitting an electronic bid will be charged an additional $42 at the time of bid submission via the online electronic bid service. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than 10 days prior to the date for opening of Bids may not be answered. Only The Work will be substantially completed on or before October 24, 2025, Final completion- October 31, 2025. 1. Base Bid: a. Replacement of deteriorated sidewalk, curb and gutter, and asphaltic pavement within the limits of the Block 1 Alley in the City of Independence, WI. 2. Bid Alternate: a. Substitution of concrete pavement in lieu of asphaltic pavement. If selected by the Onwer, respective items will be removed from the Base Bid, and substituted with items listed in the Bid Alternate. Differences in quantities of certain items reflect the change in total pavement cross section depth.
Final Planning
Roads / Highways
$130,377.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 10, 2025
April 1, 2026
Multiple Locations, Independence, WI
Related To This Project
Independence, WI
Bid Date: Sep 11 2025
Independence, WI
Bid Date: Jun 11 2025
Independence, WI
Bid Date: Apr 03 2025
Independence, WI
Bid Date: Jan 12 2022
Independence, WI
Bid Date: Jun 15 2023
Independence, WI
Bid Date: Jul 20 2022
Independence, WI
Bid Date: Jul 21 2022
Amberg, WI
Bid Date: Sep 09 2025
Rhinelander, WI
Bid Date: Sep 16 2025
Oshkosh, WI
--
Marinette, WI
Bid Date: Aug 27 2025
Lac du Flambeau, WI
Bid Date: Sep 02 2025
Milwaukee, WI
Bid Date: Sep 10 2025
Madison, WI
Bid Date: Sep 26 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
