BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2025 at 8:00 PM

Updated September 19, 2025

Renovation of an educational facility in Flagstaff, Arizona. Completed plans call for the renovation of a educational facility.

Question Deadline 09/15/2025 at 12:00 PM MT Deadline for Inquiries. Arizona Board of Regents ("ABOR"), for and on behalf of Northern Arizona University ("University" and/or "Owner"), extends an invitation to interested Construction Manager at Risk (CMAR) firms to submit in writing their qualifications (Statement of Qualifications or SOQ) to provide pre-construction and construction services for the Forestry Renovations project, NAU Project #09.820.252 on the NAU Flagstaff Mountain Campus. This solicitation follows the methodology prescribed by Section 3-804 of the ABOR Policy Manual. This Request for Qualifications (RFQ) is for the CMAR's pre-construction and construction services for renovation work in the Southwest Forest Science Complex ("Forestry", Building 82). Work will include improvements to aging building mechanical systems. The building has been beset by various mechanical system failures over the past few years. Current work by the Design Professional EAPC Architects Engineers has settled on a solution for the mechanical issues that entails a comprehensive HVAC retrofit, replacing the existing boiler and wet-wall system and connecting the building to the South Campus centralized heating and cooling network. Work will include upgrades to mechanical distribution, controls integration, and related plumbing and electrical systems. While this procurement concerns itself with mechanical system upgrades, NAU is considering additional building improvements to include roofing, hallway lighting, and flooring. These additional improvements may be added to the project scope along with associated budget at a later date or may be the subject of a separate procurement once the initial mechanical project scope has been completed. The Forestry Building was constructed in 1992 and consists of 72,137GSF. It is located at 200 E. Pine Knoll Drive, Flagstaff, AZ 86011. All correspondence relating to this project should be addressed to: NAU Facility Services Attention: Judith Scholar Winfield PO Box 6016 Northern Arizona University Flagstaff, Arizona 86011 Email: judith.scholarwinfield@nau.edu Begin Contract Period: November 2025. Construction Begins March 1, 2026 Substantial Completion: July 10, 2026 Final Completion: October 9, 2026 The Board of Regents reserves the right to reject any or all SOQs, to waive irregularities in any SOQ, or to withhold the award for any reason it may determine. Women-owned and minority-owned firms are encouraged to apply. Persons with a disability may request a reasonable accommodation.

Post-Bid

Educational

$4,000,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
14
Bidding Soon
97
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2025

March 1, 2026

Project location map

200 E Pine Knoll Dr, Flagstaff, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.